Laserfiche WebLink
035 <br /> <br />Cr®dit will be qiven for riqht-o~-~ay dedica~io~ At ~he .~ate o~ <br />$50,000 ~r ~cre e~pt ~or <br /> <br />~ re~r~ <br /> <br />3. GrAding <br /> <br />Credit will be given ~or earthwork, road a~d alc~e drainage, <br />buttreasir~, atablliastion, h~droaeedinq an~ eroaic~ c~ntrol At the <br />foll~ing ~ined rates: <br /> <br />Corridor gec~ent <br /> <br />Credit Rate <br /> <br />Ja~a~oree =c Station all*SO <br />Station $11+S0 to Moul~n Par~way <br />M~ulton Par~way to P&aao de Colinal <br /> <br />$149,784 ~er ac~e road easamemt <br />$124,132 l~er Acre road easement <br />$124,915 per ac~e mad easement <br /> <br />Fcothill/~astern Corridor <br /> <br />righ~.-o£-way (hinge ~n~ ~o h~n~ ~fl~) e~ s~ ~ drainage <br /> <br />4. Drainage Structures <br /> <br />Credit will be given for drainage structures in accordance with <br />lengths of pipe Amd unit prl~es estimated as ~oa~s in the fee program <br /> <br />dete~uine are reaaonable equivalanta cf ~he a~ucturea in the fee <br />~roqram cost estimate. U~it prices for ak-built drain&qe a~ructures <br />will be thole used in the latest fee program coat estimate. <br />Enqimeerin~ and admimiatration c~edit o~ 15% of the drainaqe atructure <br />credit will be Added. Contingency credit o~ 10% cf the <br />structure cradi2 will be Added. Terrace drains, do~mdrains <br />tam~rar2 drainage facilities or erosion control facilities are <br />included in ~he average unit cos~ of grading. <br /> <br />Credit will be given ~or ~cher l~q~ve~enCa at the rate at which ~he <br />hapr~vament was eati~ated in the fee program plus 15% for enqineerinV <br />and a~ainiatrati~ plus 10~ for contir~encios. <br /> <br />The credit rates specified above will be revised whenever the corridor <br />cnat estimates are reviaed for the ~urpoae c~ adJustir~ ~oaa. O~ce <br /> <br />-23- <br /> <br /> <br />