Laserfiche WebLink
e) Special provisions' under Section 1807 of' the UBC for GrouP B, <br /> Division 2 High Rise office buildings shall be complied with. <br /> <br />f) Proposed handicap parking spaces are not in Compliance. <br /> Handicap parking spaces must belocated so that the <br /> handicapped are not compelled to walk or wheel behind parked <br /> .cars, <br /> <br />g) <br /> <br />A parcel map shall be required prior to issuance of a <br />building permit, tying lots together so that the building <br />will not be constructed over any property lines. <br /> <br />h) <br /> <br />Plans approved by the State of California for Title 24 energy <br />requirements must be submitted to the City prior to issuance <br />of the building permit and prior to submitting plans to the <br />City for mechanical and electrical plan checks. <br /> <br />A grading permit.will not be required for an excavation below <br />finish grade for basements and footings of a building, <br />retaining wall or other struoture authorized by a valid <br />building permit. <br /> <br />J) <br /> <br />The initial plan check is running approximately 4 to 6 weeks. <br />Accelerated plan check service is available with payment of <br />additional fees. <br /> <br />C. PUBLIC SERVICES <br /> <br />1. Complete the following prior to the issuance of a building permit: <br /> <br />a) <br /> <br />b) <br /> <br />Provide street improvement plans including plans to relocate <br />traffic signals. <br /> <br />Provide on-site drainage flow plan. <br /> <br />c) Pay drainage assessment fee. <br /> <br />d) Pay transportation system improvement fee. <br /> <br />e) <br /> <br />Dedicate 15 feet radii at the four property line corners of <br />Broadway, Santa Ana Boulevard, and Sycamore and Fifth <br />Streets. <br /> <br />Complete the following prior to the issuance of a utility release <br />to the building: <br /> <br />a) <br /> <br />Improve perimeter streets as follows: <br /> <br />(1) Remove all curb. sidewalk drive approaches, street <br /> lights, signals and street'trees. <br /> <br />Broadway <br /> <br />Construct A-2 curb and gutter at 28 feet from <br />street centerltne. <br /> <br /> <br />