Laserfiche WebLink
348 <br /> <br />Project Identification <br />Transportation Area Fee <br /> <br />Page 2 <br /> <br />E <br /> <br />E <br /> <br />E <br /> <br />E <br /> <br />E <br /> <br />E <br /> <br />E <br /> <br />~E <br /> <br />E <br /> <br />E <br /> <br />F <br /> <br />F <br /> <br />F <br /> <br />F <br /> <br />F <br /> <br />F <br /> <br />F <br /> <br />F <br /> <br />17th Street between Santa Ana River and Bristol - resurface <br />Fairview Road between 17th Street and Trask - resurface <br />Bristol Street between Washington and 17th Street - resurface <br />Bristol between 1st and Washington - resurface <br /> <br />Develogment Processing Review - conduct traff]ce analysis for new <br />develog~ent <br /> <br />Westminster Avenue between Euclid and Fairview - widen to six <br />lanes <br /> <br />Bristol Street between Warner and Santiago Creek - widen to six <br />lanes <br /> <br />1st Street between Sullivan and Santa Ana River - widen to six <br />lanes <br /> <br />McFadden between Newhope and Shannon - widen to four lanes <br /> <br />East Warner Avenue at Central - widen south side adjacent to City <br />Yard <br /> <br />McFadden between Standard and East City Limit - resurface <br /> <br />Flower between 1st Street and Civic Center Drive - resurface <br /> <br />First between Flower and Bristol - resurface <br /> <br />Bristol Street between 17th Street and Memory Lane - resurface <br /> <br />Civic Center Drive extension - construct connection to Santa Ana <br />Boulevard <br /> <br />Bristol between Warner and Santiago Creek - widen to six lanes <br />Standard between 1st and Chestnut - widen to four lanes <br />Edinger between SFi~Z and Main - resurface <br /> <br /> <br />