Laserfiche WebLink
321 <br /> <br />RESOLUTION NO. 89-067 <br />Page 9 <br /> <br />Dept. and Miscellaneous <br />Fee or Service <br /> <br />FiRE DEPARTr~ENT (Cont'd) <br /> <br />Product Lines with New Tank <br /> <br />Product Lines Separately: <br /> <br />Unit <br /> <br />Charge <br /> <br />1-3 Tanks 75.00 <br />Each 25.00 <br />Each Tank 75.00 <br /> <br /> Hazardous Chemicals, First Tank <br /> <br /> Each Additional Tank <br /> <br />Tank Removal <br /> Tank Removal <br /> <br /> Each Additional Tank <br /> <br /> Field Inspection <br /> <br /> Each Additional Hour or Fraction Thereof <br /> <br />1-3 Tanks 200,00 <br />Each 80.00 <br />Each 150.00 <br />Each 100.00 <br /> <br />1-3 Tanks 250.00 <br />Each 85,00 <br />First 3 hours No Charge <br /> 25.00 <br /> <br />Inspection(s) Required Because Of Leaks Or Unauthorized Releases <br /> <br /> Inspection <br /> <br /> Each Additional <br />Hazardous Material <br /> <br /> First 3 hours <br /> <br /> Hour or Fraction Thereof <br />Clean-up Fee <br /> <br /> 50.00 <br /> 25.00 <br /> <br />Reimburse City for Actual Cost <br /> <br />one tank system. <br />Monitoring Systems: <br /> <br /> Flammable Liquids <br /> Each Additional Tank <br /> <br /> Hazardous Chemicals <br /> <br />Annual Permit/Inspection <br /> Flammable Liquids <br /> Each Additional Tank <br /> <br /> Flammable Liquids Each Tank 25.00* <br /> Hazardous Chemicals Each Tank 40.00* <br /> <br />* Manifolded tank systems will be charged by number of tanks in system - NOT as <br /> <br /> <br />