My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
89-110
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1989
>
89-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:32:14 PM
Creation date
6/26/2003 10:46:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
89-110
Date
11/20/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
South Coast Air Quality Management District Rule 403 will be <br />adhered to, insuring the clean-up of construction-related dirt on <br />approach routes to construction sites. <br /> <br />The use of energy efficient lighting along Bristol Street (low <br />pressure sodium vapor lights) shall be considered to reduce <br />emissions at the power plant servicing the area. <br /> <br />f. Traffic signals along Bristol Street shall be synchronized. <br /> <br />g. Construction activities shall be halted during local Stage Two <br /> smog alerts. <br /> <br />h. Transportation System Management (TSM) Plan shall be developed to <br /> reduce tripmaking. <br /> <br />Other changes are within the responsibility and jurisdiction of the South <br />Coast Air Quality Management District and the U.S, Environmental <br />Protection Agency. These agencies are concerned with reducing the <br />cumulative air pollution effects of growth in the region and include <br />measures adopted by these agencies to steadily improve vehicle emission <br />requirements and emission controls on stationary air pollution sources. <br /> <br />2. Land Use <br /> <br />Impact Summary. The proposed project will result in more intensive use of <br />the project area than currently exists. Intensification will result in <br />the loss Of some existing businesses and residential units as a result of <br />implementation of the proposed Redevelopment Plan and changes in land use <br />designations. This increased development may not, in some locations, be <br />compatible with adjoining residential uses and may generate conflicts, <br />such as traffic, noise, bulk and height of structures at the <br />residential/commercial interface. Presently vacant land will be <br />irretrievably committed to urban uses. <br /> <br />Mitigation Measures. With regard to-land use impacts, mitigation measures <br />have been required in, or incorporated into, the project which will avoid <br />or substantially lessen the significant environmental effects as <br />identified in the EIR. Although the mitigation measures identified in the <br />EIR will lessen project impacts, the increased development and intensity <br />of development over existing conditions cannot be fully mitigated. These <br />mitigation measures include: <br /> <br />The Agency may choose to exercise additional control over <br />development through adoption of a design guide for the project <br />area, parts of the project area, or specific development parcels. <br /> <br />bo <br /> <br />Additional mitigation measures to reduce potential land use <br />conflicts at the residential/commercial interface include the <br />construction of walls to screen development; the use of <br />landscaping; and setback requirements included in the zoning <br />ordinance. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.