My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
89-110
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1989
>
89-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:32:14 PM
Creation date
6/26/2003 10:46:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
89-110
Date
11/20/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
134 <br /> <br />Temporary culverts, ditches, catch basins, dams and settling ponds <br />will be installed where needed during construction activities to <br />maintain drainage flows and to collect excess water and sediments <br />flowing out of construction sit~s. Sediments collected will be <br />disposed of at a Class II or Class III disposal site. <br /> <br />2. Fl,po~ <br /> <br />Impact Summary. A portion of the project area is located within the Santa <br />Ana River channel and portions of the project area are located within the <br />designated lO0-year flood zone. Increased development in these areas will <br />be at some risk. <br /> <br />Hitiqation Nemsures. With regards to flood impacts, mitigation measures <br />have been required in, or incorporated into, the project which avoid or <br />substantially lessen the significant effects as identified in the EIR. <br />These measures include project improvements to the storm drain system <br />which are included as part of the proposed project to the extent <br />redevelopment funds are available. <br /> <br />The Federal Flood Insurance Agency (FIA) may require additional mitigation <br />measures to qualify for federal insurance programs including requirements <br />that all structures built within the flood hazard area must have the first <br />habitable floor elevated above the surface level of flooding and <br />demonstration that the cumulative impact of proposed development would not <br />raise the depth of flooding by more than one foot at any point in the <br />community. <br /> <br />3. Noise <br /> <br />Impact Summary. Project-generated traffic will result in minor increases <br />in ambient noise levels. Residential units previously screened from <br />street noise may be exposed to higher noise levels as a result of street <br />widening and demolition of existing structures. <br /> <br />Construction related noise may reach .significant levels in the short term. <br /> <br />Hitigation Heasures. With regard to noise impacts, mitigation measures <br />have been required in, or incorporated into, the project which ~void or <br />substantially lessen the significant effects as identified in the EIR. <br />These measures include: <br /> <br />a. Construction activities will take place only during the hours <br /> specified in the City of Santa Aha Noise Control Ordinance. <br /> <br />b. To the extent feasible, construction activities will be screened <br /> from adjacent noise-sensitive landuses. <br /> <br />c. All construction equipment shall be equipped with properly <br /> operating and maintained muffler exhaust systems. <br /> <br />d. Stationary equipment shall be placed such that emitted noise is <br /> directed away from sensitive noise receptors. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.