Laserfiche WebLink
EXHIBIT D <br /> <br /> AREA B <br /> <br /> Alton Avenue overpass at SR-55 <br /> <br /> Main at Dyer - convert existing n/b right-turn <br /> lane to a through lane and continue beyond <br /> intersection. <br /> <br /> Maple/Holiday studies <br /> <br /> N/B SR-55 off-ramp at Dyer - add third lane to <br /> off-ramp. <br /> <br /> Halladay at Dyer - convert existing w/b right- <br /> turn lane to a third w/b through lane at <br /> intersection. <br /> <br /> Alton and McGaw overpass studies (at SR-55). <br /> <br /> Dyer Road between Main and Halladay - widen to <br /> six lanes. <br /> <br /> Halladay widening between Alton and Dyer. <br /> <br /> Halladay at Dyer - traffic signal. <br /> <br /> N/B SR-55 off-ramp widening at MacArthur. <br /> <br />AREA F <br /> <br /> Ross Street resurfacing, Civic Center to Washington. <br /> Santa Aha Blvd. resurfacing, French to Santiago. <br /> <br /> Flower Street resurfacing, Santa Ana Blvd. to <br /> Civic Center. <br /> <br /> First Street resurfacing, Bristol to Flower. <br /> Civic Center Drive extension to Santa Ana Blvd. <br /> Bristol Street resurfacing, 5th Street to Warner. <br /> <br /> Standard Avenue widening, 1st Street to Chestnut. <br />AREA G <br /> <br /> McFadden resurfacing, standard to east City limit. <br /> Grand Avenue traffic signal modification at Dyer. <br /> <br /> <br />