Laserfiche WebLink
203 <br /> <br /> EXHIBIT A <br /> <br />PROJECT IDENTIFICATION DRAINAGE FEE <br /> <br /> DRAINAGE <br /> ASSESSMENT <br />EM PROJECT TITLE AREA PROJECT LOCATION LIMITS STORM DRAIN <br /> <br />C5FS 10 McFadden <br /> <br />Jackson to <br />Harbor Blvd. <br />Westerly <br /> <br />Construct 45" RCP <br /> <br />2. U-5 3 Edinger RR Tracks to <br /> (Reimbursement Grand Ave. <br /> to SAUSD) <br /> 3 Grand Ave. Edinger to <br /> S.P. of SCE <br /> <br />Construct 57" RCP <br />Construct 42" RCP <br /> <br />3. F2-5 13 Edinger FO2 Channel <br /> to Sullivan <br /> <br /> Center St. Borchard to <br /> Edinger <br /> <br />Construct 48" RCP <br />Construct 42" RCP <br /> <br />4. R1 (Phase II) 6 Anahurst Pl. Flower to <br /> to Woodland Pl. Woodland Pl. <br /> <br />Woodl and P1. <br /> <br />Anahurst P1. <br />St. Gertrude <br /> <br />Construct 12'x 8'-6" Box <br />Construct 11'x 9' Box <br /> <br /> 5. R1 (Phase III) 6 Woodland Pl. St. Gertrude Construct 11'x 9' Box <br /> St. Andrews Pl. <br /> <br />6. R1 (Remaining) 6 Garnsey St. Camile to Construct 8'6"x 9' Box <br /> St. Andrews Pl. <br /> <br /> Camile St. <br /> <br /> Ross <br /> <br />Ross to Garnsey <br /> <br />Civic Center <br />to Camile <br /> <br />Construct 7'-l"x 8'6" Box <br />Construct 6'-9" Box <br /> <br />S1 (Phase III) 5 Washington Bristol to <br /> Flower <br /> <br /> Flower Washington to <br /> Seventeenth <br /> <br />Construct 11'x 5'-6" Box <br />Construct 70" RCP <br /> <br /> <br />