Laserfiche WebLink
276 <br /> <br />13. <br /> <br />14. <br /> <br />The <br /> <br />a. <br /> <br />District shall improve Pacific Avenue as follows: <br /> <br />Remove the curb return to be removed at the corner of <br />Fifth Street and reconstruct the curb return with a <br />25 foot radius and wheelchair ramp. Construct adjacent <br />paving as required. <br /> <br />b. Remove all damaged curb, gutter, and sidewalk. <br /> Construct new curb, gutter, and full width sidewalk. <br /> <br />Close all drive approaches with curb, gutter, and <br />sidewalk. <br /> <br />Construct a 35 foot radius curb return at the northeast <br />corner of Santa Ana Boulevard with a wheelchair ramp <br />and cross gutter. <br /> <br />The District shall install street striping and signage per <br />approved Channelization and Signage Plan. <br /> <br />-3- <br /> <br /> <br />