My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-088
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2014 9:11:50 AM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-88
Date
9/4/1990
Document Relationships
87-038
(Repeals)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1987
93-046
(Repealed By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
334 <br /> <br />RESOLUTION NO. <br />PAGE 10 <br /> <br />90-088 <br /> <br />3) <br /> <br />Inspections for which no fee is <br />specifically indicated (minimum <br />charge - one (1) hour) ............. $50.00 per hour <br /> <br />4) <br /> <br />Additional plan review required <br />by changes, additions or revisions <br />to approved plans (minimum <br />charge - one (1) hour) ............. $50.00 per hour <br /> <br />PLAN CHECK FEES <br /> <br />Whenever electrical plans are required by the Building <br />Official, plan check fees shall be sixty-five percent (65%) of <br />the electrical permit fee and shall be paid at the time of <br />submitting plans. <br /> <br />C MECHANICAL CODE <br /> <br /> Any person desiring a permit required by the <br />Mechanical Code shall, at the time of filing an application <br />therefor, pay a fee equal to $15.00 plus the sum of the fees <br />for the work to be done under the permit as set forth in the <br />following schedule, provided, however, that the minimum fee for <br />the issuance of any permit shall be $35.00. <br /> <br />(NOTE: A Mechanical Code permit fee is separate from and <br />additional to the fee for any other permit which may be <br />required by Code provisions other than the Mechanical Code.) <br /> <br />FEE SCHEDULE <br /> <br />1) <br /> <br />For the installation or relocation <br />of each forced-air or gravity-type <br />furnace or burner, including ducts <br />and vents attached to such appliance, <br />up to and including 100,000 BTU/h ............. $ 18.00 <br /> <br />2) <br /> <br />For the installation or relocation <br />of each forced-air or gravity-type <br />f~rnace or burner, including ducts <br />and vents attached to such appliance <br />over 100,000 BTU/h ............................ $ 25.00 <br /> <br />3) For the installation or relocation of <br />each floor furnace, including vent ............ $ 18.00 <br /> <br />4) <br /> <br />For the installation or relocation of <br />each suspended heater, recessed wall <br />heater or floor-mounted unit heater ........... $ 18.00 <br /> <br />10. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.