Laserfiche WebLink
RESOLUTION NO 90-088 <br />PAGE 13 <br /> <br />337 <br /> <br />2) <br /> <br />Re-inspection fee assessed under <br />provisions of Section 305(g), <br />Uniform Building Code ..................... $50.00 <br /> <br />each <br /> <br />3) <br /> <br />Inspections for which no fee is <br />specifically indicated (minimum <br />charge - one (1) hour) ................ $50.00 per hour <br /> <br />4) <br /> <br />Additional plan review required by <br />changes, additions or revisions to <br />approved plans (minimum charge - <br />one (1) hour) ......................... ~50.00 per hour <br /> <br />PLAN CHECK FEES <br /> <br />Whenever mechanical plans are required by the Building <br />Official, plan check fees shall be sixty-five percent (65%) of <br />the mechanical permit fee and shall be paid at the time of <br />submitting plans. <br /> <br />D. PLUMBING CODE <br /> <br /> Any person desiring a permit required by the <br />Plumbing Code shall, at the time of filing an application <br />therefor, pay a fee equal to $15.00 plus the sum of the fees <br />for the work to be done under the permit as set forth in the <br />following schedule, provided, however, that the minimum fee for <br />the issuance of any permit shall be $35.00. <br /> <br />(NOTE: A Plumbing Code permit fee is separate from and <br />additional to the fee for any other permit which may be <br />required by code provisions other than the Plumbing Code.) <br /> <br />FEE SCHEDULE <br /> <br />1) <br /> <br />For each plumbing fixture or trap <br />or set of fixtures on one trap (in-' <br />cluding water, drainage piping, and <br />backflow protection therefor) ................. <br /> <br />6.00 <br /> <br />2) For each building sewer and each <br /> trailer park sewer ............................ ~ 18.00 <br /> <br />a) Each additional connection ............... $ 6.00 <br /> <br />b) <br /> <br />Each additional 100 feet or <br />fraction thereof ......................... ~ 6.00 <br /> <br />13. <br /> <br /> <br />