Laserfiche WebLink
332 <br /> <br />RESOLUTION NO. <br />PAGE 8 <br /> <br />90-088 <br /> <br />Over 100 and not over 500 HP, KW, <br />KVA each ....................................... $35.00 <br /> <br />Over 500 HP, KW, KVA each ...................... $50.00 <br /> <br />The following fees include all switches, <br />receptacles, fixtures, and outlets: <br /> <br />Receptacles, outlets, light <br />fixtures and general use switches, <br />each .......................................... <br /> <br />.50 <br /> <br />Signs and high potential gas <br />tube lighting, each ............................ ~18.00 <br /> <br />NOTE: This shall include all necessary <br /> control equipment. <br /> <br />Temporary services: <br /> <br />At the time of application for temporary power the owner <br />shall post a one thousand dollar (~1,000.00) cash or <br />surety bond conforming to the Santa Ana Municipal code <br />Section for each service meter. This bond shall be <br />released upon request after the Certificate of Completion <br />or Certificate of Occupancy is issued. <br /> <br />FEE SCHEDULE <br /> <br />Temporary electric service prior to <br />final approval or occupancy, <br />each meter .................................... $125.00 <br /> <br />Temporary work with service, <br />each meter .................................... ~ 18.00 <br /> <br />Temporary power - construction: <br /> <br />For services supplying a temporary <br />power pole, pedestal or piggyback ............. ~ 30.00 <br /> <br />For a system of distribution and <br />u~ilization of poles for temporary <br />construction power, each pole ................. <br /> <br />6.00 <br /> <br /> <br />