My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-088
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2014 9:11:50 AM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-88
Date
9/4/1990
Document Relationships
87-038
(Repeals)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1987
93-046
(Repealed By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
332 <br /> <br />RESOLUTION NO. <br />PAGE 8 <br /> <br />90-088 <br /> <br />Over 100 and not over 500 HP, KW, <br />KVA each ....................................... $35.00 <br /> <br />Over 500 HP, KW, KVA each ...................... $50.00 <br /> <br />The following fees include all switches, <br />receptacles, fixtures, and outlets: <br /> <br />Receptacles, outlets, light <br />fixtures and general use switches, <br />each .......................................... <br /> <br />.50 <br /> <br />Signs and high potential gas <br />tube lighting, each ............................ ~18.00 <br /> <br />NOTE: This shall include all necessary <br /> control equipment. <br /> <br />Temporary services: <br /> <br />At the time of application for temporary power the owner <br />shall post a one thousand dollar (~1,000.00) cash or <br />surety bond conforming to the Santa Ana Municipal code <br />Section for each service meter. This bond shall be <br />released upon request after the Certificate of Completion <br />or Certificate of Occupancy is issued. <br /> <br />FEE SCHEDULE <br /> <br />Temporary electric service prior to <br />final approval or occupancy, <br />each meter .................................... $125.00 <br /> <br />Temporary work with service, <br />each meter .................................... ~ 18.00 <br /> <br />Temporary power - construction: <br /> <br />For services supplying a temporary <br />power pole, pedestal or piggyback ............. ~ 30.00 <br /> <br />For a system of distribution and <br />u~ilization of poles for temporary <br />construction power, each pole ................. <br /> <br />6.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.