Laserfiche WebLink
:1.48 <br /> <br />VI. <br /> <br />1. <br /> <br />2. <br /> <br />3. <br /> <br />GENERAL FINDINGS <br /> <br />The plans for the project have been prepared and analyzed so as to <br />provide for public Involvement In the planning and CEQA process. <br /> <br />The plans for the project are In conformance with policies set forth <br />under the General Plan and the South Main Street Redevelopment Plan. <br /> <br />To the degree that any Impacts described in the EIR are perceived to <br />have a significant effect on the environment, or such impacts appear <br />ambiguous as to their effect on the environment, any significant <br />effect of such impacts has been substantially lessened or avoided by <br />the mitigation measures set forth in the Final EIR or is outweighed by <br />the facts set forth in the Statement of Overriding Considerations. <br /> <br />Comments regarding the Draft EIR received during the public review <br />period and during public testimony before the Planuing Commission <br />have been adequately responded to in written Responses to Comments <br />attached to the Final EIR. Any significant effects described in such <br />comments were avoided or substantially lessened by the mitigation <br />measures described In the Draft EIR and the Addendum to the Draft <br />EIR or are outweighed by the facts set forth in the Statement of <br />Overriding Considerations. <br /> <br />Specific economic, social, or other considerations amke infeasible <br />mitigation measures not Identified in tbe Draft EIR and the Addendum <br />or the project alternatives Identified in the Draft EIR. <br /> <br />24 <br /> <br /> <br />