Laserfiche WebLink
32,6 <br /> <br />the proposed project. The level of enhancement of Santiago Park <br />would be reduced because there would be fewer developer <br />contributions. <br /> <br />Most importantly, this alternative would not fully attain the city <br />of Santa Ana's basic objectives with respect to the proposed <br />project. For example, the alternative would not result in the <br />preferred mix of land uses, and tax revenues would not be maximized <br />for the city. Infrastructure improvements for the surrounding <br />areas would take place at a reduced level or not at all. The <br />reduced level of development could not support the same level of <br />exactions being provided by the project as proposed. No benefits <br />from mixed-use commercial and residential uses combined on-site <br />would occur. Thus, while the alternative is environmentally <br />superior to the proposed project, this alternative would not attain <br />the city's basic objectives with respect to the proposed project <br />because it is not mixed use. <br /> <br />[Revised Draft EIR, pp. 6-10 to 6-17, and Appendix F, p. 111] <br /> <br />ALTERNATIVE LAND USE (ALL OFFICE) <br />(ALTERNATIVE C) <br /> <br />FINDINGS <br /> <br />Specific economic, social or other considerations make infeasible <br />the mitigation measures or project alternatives in the EIR. <br /> <br />2. FACTS IN SUPPORT OF THE FINDIN(t: <br /> <br />The Ail office Alternative would alter the proposed project by <br />removing the single-family attached housing and the high-rise <br />residential tower (a total of 280 units or 427,660 square feet of <br />residential uses) and replacing them with the two 92,000 square <br />foot 2-story office buildings. These low-rise office buildings <br />would be located on the eastern third of the project site (the <br />location of the residential uses is on the western half of the <br />proposed project) and would be surrounded by landscaping to create <br />a garden-like business environment. The office, retail and other <br />commercial uses on the western half of the site would remain the <br />same as that proposed. The project would total 1,634,950 square <br />feet: 817,125 square feet for Phase I and 817,825 square feet for <br />Phase II. It would have a FAR of 2.3. <br /> <br />Many environmental impacts of this alternative would be similar to <br />those expected from the proposed project. Grading and geological <br />impacts associated with the development of this alternative would <br />be similar in intensity and extent as those anticipated with the <br />proposed project. Because the amount of grading is similar, the <br />amount of fugitive dust emissions associated with this alternative <br />would be similar to that of the proposed project. Impacts on <br />surface drainage and groundwater recharge would be about the same <br /> <br />36 <br /> <br /> <br />