My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
93-036 - Environmental Impact Report for the Main Street Concourse Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1993
>
93-036 - Environmental Impact Report for the Main Street Concourse Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:17 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
93-36
Date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
355 <br /> <br />Mechanical Equipment <br /> <br />39. (10) <br /> <br />All mechanical equipment within the project boundaries shall be made to comply with <br />City and County of Orange Noise Ordinance noise level limits and shall be monitored <br />annually until complete buildout of the project. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification <br /> <br />Architectural plans check and <br />annual field inspection <br /> <br />Responsible Parties <br /> <br />Environmental Consultant, Case <br />Planner, and Environmental <br />Coordinator, Planning Division; <br />Building Inspector <br /> <br />Helicopter Operations <br /> <br />40. (1 I) <br /> <br />A written operations and protocols manual shall be developed by the property manager <br />for the helistop and shall include measures to minimize impact to residential land uses <br />to less than 65 CNEL. These measures shall limit total operations to 8 flights per day; <br />no more than one per hour; and shall restrict non-emergency operation of the helistop <br />facility to the hours between 7:00 a.m and 7:00 p.m., daily. All assumptions used in <br />the preparation of the noise analysis shall be incorporated as conditions associated with <br />the use of the helistop. <br /> <br />Timing of Implementation/Verification <br /> <br />Prior to Phase I Certificate of <br />Occupancy for the building on <br />which the helipad will occur <br /> <br />Method of Verification <br /> <br />Architectural plans check and <br />field inspection <br /> <br />Responsible Parties <br /> <br />Planning Manager and <br />Environmental Coordinator, <br />Planning Division; Building <br />Manager <br /> <br />/B3/S:11340001 .MM A-19 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.