Laserfiche WebLink
,432 <br /> <br />Conditional Use Permit No. 92-9 <br />April 19, 1993 <br />Page S of 10 <br /> <br />eo <br /> <br />Prior to release of utilities (occupancy) of any Phase I non- <br />residential unit, complete the following: <br /> <br />1. Construct Concourse Drive (Main Street Concourse) per <br /> approved plan. <br /> <br />Install traffic signal at Owens Drive & Concourse Drive <br />(Main Street Concourse) per approved traffic signal plan <br />and improvement plans for Lincoln properties. <br /> <br />Install signage and striping on Owens Drive and Main Street <br />per approved channelization plan. <br /> <br />Modify traffic signal at the intersection of Main Street <br />and Concourse Drive (Main Street Concourse) per approved <br />Traffic Signal Plan. <br /> <br />5. Remove and replace all damaged sidewalk. <br /> <br />At the intersection of Lawson Way and Town & Country Road <br />complete the following: <br /> <br />1) Stripe the eastbound approach for dual left-turn <br /> lanes, two through lanes, and two receiving lanes. <br /> <br />7o <br /> <br />2) Stripe the northbound approach for one left-turn <br /> lane, two through lanes, and two receiving lanes. <br /> <br />Pay a cash deposit of $100,000 for Neighborhood Traffic <br />Mitigation per Section 10(d) of the Development Agreement. <br /> <br />So <br /> <br />Construct driveway and other on-site work to "Lincoln" <br />property per approved Improvement Plans. <br /> <br />The following are conditions of Phase II: <br /> <br />a. Prior to the issuance of any Phase II building permit, complete <br /> the following: <br /> <br />1. Dedicate new bus turn out area per approved plans. <br /> <br />Vacate un-needed portion of existing bus turn out. <br /> <br />NOTE: Contact the Redevelopment and Real Estate office for <br /> assistance in previous two items. <br /> <br />Conduct Traffic Signal Warrants for the proposed traffic <br />signal at the intersection of Lawson Way and private drive. <br />These warrants are to be conducted prior to the issuance of <br />each Phase II building permit. <br /> <br />Secure traffic signal easements from the two properties on <br />the east side of Lawson Way at the northernmost driveway <br />per approved traffic signal plans. <br /> <br />Secure approval by the Cities of Orange and Santa Aha for <br />the Lawson Way traffic signal plans and easements. <br /> <br /> <br />