Laserfiche WebLink
RESOLUTION 94-020 <br /> <br />349 <br /> <br />e) <br /> <br />The project will improve signal progression on Main Street <br />through the elimination of one arterial signal. <br /> <br />Improve Traffic Flow on McFadden Avenue <br /> <br />The realignment and widening of McFadden Avenue between Maple and <br />Main Street will improve traffic flow on McFadden Avenue. <br /> <br />The project will eliminate the off,,et intex~ections at Main <br />Street, thereby replacing the right mm/left mm movement <br />along McFadden at Main with a through movement. Thus, the <br />project is anticipated to reduce travel times for an average <br />motorist along McFadden by approximately 60 seconds at <br />peak hour. <br /> <br />b) <br /> <br />Thc project will improve intersection efficiency and levels of <br />service at the Main/McFadden intersection (as noted above). <br /> <br />Improve Bicycle and Pedestrian Safety at Schools in the Vicinity <br /> <br />It has been demonstrated that cars turning left and right present more of an <br />accident threat to bicyclist~ and pedestrians than through traffic. Changing <br />the "right/left" through movement on McFadden to a straight movement will <br />lessen conflicts with students accessing Lathrop Intermediate School and <br />Franklin Elementary School. <br /> <br />Reduce Through Traffic on Cypre~ Avenue <br /> <br />The cul-de-sacing of Cypress Avenue at realigned McFadden Avenue will re- <br />duce the through traffic on Cypress. Reduction of through traffic on residen- <br />tial streets is consistent with City policy. <br /> <br />CONCLUSION <br /> <br />Specific economic, social or other considerations make the alternatives to the <br />propo~."d project infeasible, as identified and analyzed in the project Final <br /> <br />For the identified significant impac~ that cannot be mitigated to a level <br />below significance, the City of Santa Aha finds that all of the mitigation <br />rneasur~ specified in the Final EIR are feasible and have been required on <br />the project by the Conditions of Approval. The City of Santa/ma finds that <br />the project benefits outweigh the significant unavoidable adverse impacts <br />from short-term project construction activities. <br /> <br />04/13/94(I: ...SNA402 ..OVEI~D E.RFr) <br /> <br />4 <br /> <br /> <br />