Laserfiche WebLink
RESOLUTION 94-020 <br />- 357 <br /> <br />[, <br />[ <br /> <br /> Table 1 <br />Mitigation Monitortq. g Program Activities <br /> <br /> Mitigation Measure <br /> <br />This program shall be implemented during proiect construction. <br /> <br />11-1 During clearing, gradin~ earth moving, excavation and construction: <br /> <br />Fugltiv~ du~t will be controlled by regular watering, paving construction <br />remS, and~r other dust preventive measures as defined in SCAQMD <br />Rule 405; <br /> <br />Equipment enginea wiU be maintained in proper rune, and construction <br />will be di.~x)ntinued during second stage smog alerts. <br /> <br />11-I After clearing, grading, earth moving or excavation: <br /> <br />Seeding and watering WiU be performed untit vegetation cover is grown; <br /> <br />Soil binder~ will be spread; <br /> <br />11-3 <br /> <br />Bare soil are~ ~will be wet down suffleiendy to form a crust on the sur- <br />~,'e. with repeated soaking as ne~'~*=~y to maintain the crust and pre- <br />· ~nt dust pickup by the wind; and <br /> <br />Street $~-epthg W/Il be performed in th0~"~,e m where excessive d~st <br />would be (tarried over to area residences and/or adjacent public <br />d~oroughm~. <br /> <br />Contrac~rs will comply with all appUcable City of Santo Ama sound <br />control and noise level requiremem~, regulations and ordinances, <br />indnsh~ of ordinance~ limiting houm of construction, <br /> <br />~h internal.combustion engine used for any purpose on the project or <br />~ to the project will be equipped with a muffler of a type recom- <br />mended by the manufacturer. No internal combustion engine wiU be <br />operated on the project without a muffler. <br /> <br />11-5 City of Santo Aha noise level requirement~ wiLl. apply to ali equipment <br /> (an ~he project or related to the project including, but not limited to, <br /> ~ tran~t mixe~ or transient equipment. The use of loud sound <br /> signals wiU be avoided in favor of v~ruing lights, except tho~e requ/red <br /> by ~few ~ for the protection of personnel. <br /> <br />11-6 Construction planning shall group no'~3r operations to avoid continuing <br /> ~ of g~ater annoyance. <br /> <br /> Responsible <br />Timing of Agency/ <br /> <br />Specifications: pdor PWA- <br />to approval of Final construction <br />PS&E; field site <br />inspection: weekly inspectors <br />during pre- <br />construction and <br /> <br />Specifications: prior <br />to approval of Final <br />PS&E; field <br />inspection: weekly <br />during pre- <br />construction and <br />construction activities <br /> <br />Specifications: prior <br />to approval of Final <br />PS&E; field <br />inspcctfon: bi-weekly <br />during pre- <br />construction and <br />construction activities <br /> <br />Specifications: pdor <br />to approval of Final <br />PS&E; field <br />inspection: bi-weekly <br />during pre- <br />construction and <br /> <br />Prior to approval of <br />Final PS&E <br /> <br />Prior to approval of <br />Final PS&E <br /> <br />PWA <br /> <br />PWA <br /> <br />construction <br />site <br />inspectors <br /> <br />site <br />inspectors <br /> <br />6 <br /> <br /> <br />