Laserfiche WebLink
RESOLUT O 94-02 295 <br /> <br />measure. Designated monitors will also be responsible for filing <br />and updating the verification forms during all phases of the <br />project. During design and construction phases, the designated <br />monitors from the Planning and Building Agency will determine the <br />need for a measure to be modified and ensure the use of a <br />mitigation specialist if technical expertise beyond the monitor's <br />ability is required. If it is found that an adopted mitigation <br />measure is not being properly implemented, the designated monitors <br />shall require corrective actions to ensure adequate implementation. <br /> <br /> <br />