My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-023
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:01 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-23
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 94-023 <br /> <br />33. Bicycle racks shall be provided on-site to encourage alternative modes of <br /> tr~.nsportation by employees. <br /> <br />Mitigation measure no. 31 is designed to further reduce traffic impacts with <br />commensurate reductions in air quality impacts through implementation of a <br />Transpox~afion Demand Management Program (TDMP). The TDMP is designed to <br />ensure that vehicle trips to the project are reduced by 15% from average levels <br />generated for similar projects of similar size. <br /> <br />Although complete mitigation of these air quality impacts from mobile sources is not <br />possible, mitigation measures nos. 31 through 33 include all mitigation measures <br />commonly used by regulatory agencies and recommended by the AQMD for <br />mitigation of impacts generated from vehicular sources. <br /> <br />NOISE :' Short-term Construction Noise <br /> <br />Construction of the proposed project would intermittently generate high noise levels <br />on and adjacent to the site. The loudest noise from construction activities would <br />affect sensitive receptors in the project vicinity for a period of approximately 32 <br />weeks, the estimated duration of project construction. Residents immediately south of <br />the site would experience intermittent noise levels of up to 89 dBA. Residents to the <br />southwest would experience noise levels of up to 74 dBA, and the Carehouse <br />Convalesgent Center would experience noise levels of up to 71 dBA. <br /> <br />Findin~ <br /> <br />Changes or alterations have been required in, or incorporated into the <br />project which avoid or substantially lessen the significant environmental <br />effect identified in the ErR. <br /> <br />Facts in SuD~°rt of Findin~ <br /> <br />The significant effects have been substantially lessened, but not to' a level of <br />insignificance, by virtue of the following mitigation measures identified in the Final <br />EIR and incorporated into the project. <br /> <br />35. <br /> <br />All outdoor construction activities shall be limited to the hours of 7:00 a.m. to <br />8:00 p.m., Monday through Saturday. No construction activities shall be <br />permitted on Sundays or federal holidays. <br /> <br />36. <br /> <br />All construction equipment, stationary or mobile, shall be equipped with <br />properly operating and n~intained muffling devices. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.