My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
94-023
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1994
>
94-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:31:01 PM
Creation date
6/26/2003 10:46:59 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
94-23
Date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
474 RESOLUTION 94-023 <br /> <br />1.0 INTRODUCTION <br /> <br />'me State of California Public Resources Code § 21081.6 (AB 3180) requires that a lead or <br />responsible agency must adopt a mitigation monitoring or reporting program when approving or <br />carrying out a project where an environmental document, either an Environmental Impact Report <br />(EIR) or Mitigated Negative Declaration has identified measures to reduce potential adverse <br />environmental impacts to levels that are less than significant. The City of Santa Ant is the lead <br />agency for the Santa Aha Gateway Center project and, therefore, is responsible for <br />implementation of the mitigation monitoring program. An EIR has been prepared for this project <br />which addresses the potential environmental impacts and, where appropriate, recommends <br />measures to mitigate these impacts. As such, a mitigation monitoring program is required to <br />ensure that adopted mitigation measures are successfully implemented. <br /> <br />Section 2 describes the roles of responsible parties in implementing and monitoring the adopted <br />mitigation measures, and generally describes the program procedures. <br /> <br />Attachment A contains the mitigation measures for the project and identifies the timing of the <br />implementation or verification of each measure, the method of verification, and the party <br />responsible for verifying that the measure is successfully implemented. The applicant is <br />responsible for the implementation of each measure, and the City representative is responsible for <br />verifying that the measure has been satisfactorily completeti tiuough plan check, field <br />inspections, and/or written evidence submitted to the City by the applicant, or the applicant's <br />agent, which verifies that the measure has been successfully implemented. <br /> <br />Attachment B contains a sample "compliance verification" form which can be used to report the <br />project's compliance of each measure. The City may develop alternative forms for use in <br />compliance verification. <br /> <br />-1- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.