Laserfiche WebLink
RESOLUTION 94-023 <br /> <br />The Enviwnmental Coordinator, or designated assignee, will, primarily through plan checks and <br />field inspections, supervise the design and construction of the project, and will be responsible for <br />the overall management of the MMP. The above noted designated "monitors" shall oversee <br />elements of the MMP and review compliance through the use of complianee verification forms to <br />be developed by the City and supported by the Environmental Coordinator. A sample of a <br />compliance verification form is provided in Agachment B. Designated monitors shall ensure <br />compliance verification forms are filled out correctly and proper action is being taken on each <br />measure. Designated monitors will also be responsible for filing and updating the verification <br />forms during all phases of the project~ During the design and construction phases, the designated <br />monitors from the Planning and Building Agency will determine the need for a measure to be <br />modified and ensure the use of a mitigation specialist, such as a consulting engineer, if technical <br />expertise beyond the monitor's ability is required. If it is found that an adopted mitigaxion <br />measure is not being properly implemented, the designated monitors shall require corrective <br />actions to ensure adequate implementation. <br /> <br />-3- <br /> <br /> <br />