Laserfiche WebLink
95-022 <br /> <br />For a system of distribution and <br />utilization of poles for temporar <br />construction power, each pole <br /> <br />$6.50 <br /> <br />16) Temporary construction lighting: <br /> <br />500 lamps or less . $3.00 <br />Over 500 lamps . $5.00 <br /> <br />17) Temporary services: <br /> <br />At the time of application for temporary power, the owner <br />shall post a one-thousand dollar ($1,000.00) cash or surety <br />bond conforming to the Santa Ana Municipal Code Section 8- <br />1768 for each service meter. This bond shall be released upon <br />request after the Certificate of Completion or Certificate of <br />Occupancy is issued. <br /> <br />Temporary electric service prior to <br />final approval or occupancy, <br />each meter <br /> <br />$127.00 <br /> <br />Temporary work with service, <br />each meter <br /> <br />$18.00 <br /> <br />18) Lighting standards: <br /> <br />With one (1) fixture each <br /> <br />$6.50 <br /> <br />Each additional fixture on the <br />same standard <br /> <br />$2.00 <br /> <br />19) Time clock or photo electric cell, each <br /> <br />$5.00 <br /> <br />20) Radiant ceiling heat per room <br /> <br />$6.50 <br /> <br />21) <br /> <br />Power apparatus: generators, motors, <br />transformers, rectifiers, synchronous <br />converters, capacitors, industrial <br />heating, cooking or baking equipment, <br />and other apparatus as follows: <br /> <br />(Ratings - horsepower (HP), kilowatts (KW), <br />and Kilovolt amps (KVA) <br /> <br />Up to and including 1 HP, KW, <br />KVA each . <br /> <br />· $2.50 <br /> <br />Over 1 and not over 10 HP, KW, <br />KVA each . <br /> <br />. $7.00 <br /> <br />Page 51 <br /> <br /> <br />