Laserfiche WebLink
ESOL ON 95-024 <br /> <br />3.0 GENEI~J~L PROCEDURES <br /> <br />The Environmental Coordinator will monitor, inspect, verify and <br />supervise the incorporation of all mitigation measures listed in <br />this reporting and monitoring program. The Environmental <br />Coordinator will also be responsible for the overall management of <br />the MMRP. <br /> <br />Verification forms will be completed and submitted to the <br />Environmental Coordinator in those situations where City staff, <br />other than the Environmental Coordinator, has the appropriate <br />expertise to verify and acknowledge that a specific mitigation <br />measure has been implemented. The completed verification forms <br />shall be kept with this Mitigation Monitoring and Reporting Program <br />throughout the life of the Amendment to the South Main Street <br />Redevelopment Plan. A sample copy of the Verification Form is <br />included as Appendix A. <br /> <br />If the Environmental Coordinator determines that a mitigation <br />measure has not been properly implemented, the Environmental <br />Coordinator shall assure the mitigation measure shall be <br />implemented before additional project approvals or permits can be <br />issued. <br /> <br /> <br />