My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
95-062
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1995
>
95-062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:53 PM
Creation date
6/26/2003 10:47:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
95-62
Date
10/2/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 95-062 <br /> <br />Agency and Public Works Agency will determine the need for a measure to be modified and <br />ensure the use of a mitigation specialist if technical expertise beyond the monitor's ability is <br />required. If it is found that an adopted mitigation measure is not being properly implemented, <br />the designated monitors shall require corrective actions to ensure adequate implementation. <br /> <br />Am <br /> <br />In order to reduce dust from construction traffic, the City of Santa Aha shall <br />sweep primary haul routes on a daily basis within a 1/4 mile radius of the project <br />site. <br /> <br />-Responsible for Implementation: City of Santa Aha, Public Works Agency <br /> <br />-Monitoring Phases: <br /> <br />During constmcfion <br /> <br />-Method of Monitoring: Site Inspections <br /> <br />-Monitoring Agency: <br /> <br />City of Santa Aha Planning and Building Agency and City <br />of Tustin <br /> <br />The use of all construction equipment operations shall be suspended during <br />second stage smog alerts. <br /> <br />-Responsible for Implementation: City of Santa Aha, Public Works Agency and <br /> construction foreman. <br /> <br />-Monitoring Phases: <br /> <br />During construction <br /> <br />-Method of Monitoring: Site inspections <br /> <br />-Monitoring Agency: <br /> <br />City of Santa Ana, Planning Division <br /> <br />To reduce construction equipment emissions, low-sulfur fuel shall be used for <br />stationary construction equipment pursuant to Rule 431.2. <br /> <br />-Responsible for Implementation: City of Santa Ana, Public Works Agency <br /> <br />-Monitoring Phases: <br /> <br />During Construction <br /> <br />-Method of Monitoring: Site inspections <br /> <br />-Monitoring Agency: <br /> <br />City of Santa Ana, Planning Division <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.