My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
95-078
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1995
>
95-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:54 PM
Creation date
6/26/2003 10:47:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
95-78
Date
12/4/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 95-078 <br /> <br />Conditional Use Permit No. 95-19 <br />November 6, 1995 <br />Page 1 of 2 <br /> <br />Conditions for ADDrevaI <br /> <br />Should Conditional Use Per, it No. 95-19 be approved, the project shall <br />comply with all applicable sections of the Santa Ana Municipal Code, <br />the California Administrative Code, the Uniform Fire Code, the Uniform <br />Building Code and all other applicable regulations. In addition, it <br />shall meet the following conditions: <br /> <br />A. Plannlnq Division <br /> <br />Ail signage for the site will need to be in conformance <br />with the provisions of the Sign Code. <br /> <br />Ail on-site trees need to be upgraded to a minimum of 24 <br />inch box size or larger as shown on the approved landscape <br />plan. <br /> <br />Plant flowering vines on the block walls and trash <br />enclosure in order to reduce graffiti. <br /> <br />The convenience store will be limited to operating between <br />the hours of 5:00 a.m. and 12:00 a.m. <br /> <br />Development is to proceed consistent with Site Plan Review <br />DP No'. 94-65 <br /> <br />B. Pollce Department <br /> <br />The existing building and parking lot must conform with the <br />provisions of Chapter 8, Article II, Division 3 of the <br />Santa Ana Municipal Cede (Building Security Ordinance). <br />These code conditions will require that the existing <br />project's lighting, door and wihdow locking devices and <br />addressing be upgraded to current code standards. Light <br />standards cannot be located in required landscape planters. <br /> <br />EXHIBIT B <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.