Laserfiche WebLink
344 <br /> <br />EARTH RESOURCES <br /> <br /> 1. The project shall impIement standard engineering practices and design methods <br /> to reduce potential grading impacts to acceptable levels. <br /> <br />-Responsible for hnplementation: City of Santa Aha, Public Works Agency <br /> <br />-Monitoring Phases: <br /> <br />-Method of Monitoring: <br /> <br />-Monitoring Agency: <br /> <br />Project Design <br /> <br />Project Review <br /> <br />City of Santa Aha Public Works Agency <br /> <br />2. During construction, prompt revegetation of slopes and landscaped areas shall be <br /> implemented. <br /> <br /> -Responsible for Implementalion: City of Santa Ana, Public Works Agency <br /> <br />-Monitoring Phases: During construction <br />-Method of Monitoring: Site Inspections <br />-Monitoring Agency: City of Santa Ana Planning and Building Agency <br /> <br />3. Possible water erosion duriug construction shall be mitigated by the installation <br /> of temporary erosion coutrol devices, as required by the State Regional Water <br /> Quality Control Board. <br /> <br />-Responsible for hnplemeatntion: City of Santa Aha, Public Works Agency <br /> <br />-Monitoring Phases: During construction <br />-Method of Monitoring: Site inspections <br />-Monitoring Agency: City of Santa Aha, Planning Division <br /> <br />4. Utilization of desiltation devices such as sandbags or temporary basins in areas <br /> that may discharge into City sewers shall be implemented prior to the <br /> commencement of grading activities. <br /> <br />-Responsible for Implementation: City of Santa Aha, Public Works Agency <br /> <br />-Monitoring Phases: During grading <br /> <br /> <br />