Laserfiche WebLink
RESOLUTION 96-035 <br /> <br />REVENUE <br />~ ~,P~.~SCELI,ANEOUS FEE OR SERVICE <br /> <br />SECTION VI PUBLIC WORKS AGENCY - CONTINUED <br /> <br />86-01-5921 Storm Drains/Culverts, Sewer, Water Mains/Line Channels <br /> In Dirt-S80.80 minimum <br /> <br /> In Paving-S80.80 minimum <br /> <br />UNIT <br /> <br />Linear Foot <br />Minimum <br />Linear Foot <br />Minimum <br /> <br />PROPOSED <br />FEES <br /> FY 96-97 <br /> <br /> 2.59 <br />80.80 <br /> 2.95 <br />80.80 <br /> <br />86-01-5920 <br />86-01-5921 <br /> <br />86-01-5921 <br /> <br />86-01-5921 <br /> <br />86-01-5921 <br /> <br />86-01-5921 <br /> <br />86-01-5921 <br /> <br />86-01-5921 <br /> <br />Sewer Laterals/Water Services <br /> <br />Traffic Occupancy or Lane Closure Requiring Signage <br /> All Streets <br /> Minor Streets <br /> Major Streets <br /> <br />Manhole, Vaults, Catch Basins andrequired signage, <br /> striping or barricades <br /> Plns Earthwork <br /> <br />Curb, Gutter or Combination including Earthwork <br /> $80.80 minimum <br /> <br />Curb Return, including Earthwork <br /> $80.80 minimum <br /> <br />Sidewalk including Earthwork <br /> $80.80 minimum <br /> <br />Drive Approach including Earthwork <br />$80.80 minimum <br /> <br />Paving, including Earthwork <br /> (0 - 2000 sq. fi.)-$80.80 minimum <br /> (Over 2000 sq.ft.)$80.80 minimum <br /> <br />86-01-5921 Fencing <br /> <br />86-01-5621 <br />86-01-5921 <br />86-01-5921 <br />86-01-5621 <br /> <br />Masonry, Concrete or Block <br />$80.80 minimum <br /> <br />Street Trees <br /> By Developer, Inspection Only-S58.58 min. <br /> <br />Permanent Street Patch Guarantee <br /> Refundable if done in 30 calendar days <br /> <br />Projects Exceeding $100,000 and/or <br /> Work items not included here <br /> <br />Overtime Rate for InspecWrs <br /> <br />Each <br /> <br />Per Day <br />Deposit <br />Deposit <br /> <br />Each <br /> <br />Linear Foot <br />Minimum <br /> <br />Each <br />Minimum <br /> <br /> Sq. Foot <br />Minimum <br /> <br />Sq. Foot <br />Minimum <br /> <br />Sq. Foot <br />Sq. Foot <br />Minimum <br /> <br />Linear Foot <br />Minimum <br /> <br />Each <br /> <br /> Sq. Foot <br /> <br />Percent of estimated <br />construction costs <br /> <br />Hour <br /> <br />179.78 <br /> <br />168.67 <br />533.28 <br />710.03 <br /> <br />135.34 <br /> <br /> 1.09 <br />80.80 <br /> <br />43.43 <br />80.80 <br /> <br /> 0.39 <br />80.80 <br /> <br /> 0.51 <br />80.80 <br /> <br /> 0.17 <br /> 0.12 <br />80.80 <br /> <br /> 0.96 <br />80.80 <br /> <br />20.71 <br /> <br />20.35 <br /> <br />3.25% <br /> <br /> 33.33 <br /> <br />Page 27 <br /> <br /> <br />