My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
96-035
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1996
>
96-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2014 1:59:14 PM
Creation date
6/26/2003 10:47:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
96-35
Date
4/1/1996
Document Relationships
95-022
(Repeals)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1995
97-030
(Repealed By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
589 <br /> <br />RESOLUTION 96-035 <br /> <br />IV. <br /> <br />MECHANICAL CODI~ <br /> <br />Any person desiring a permit required by the Mechanical Code shall, at the time of <br />filing an application therefor, pay a fee equal to $17.00 plus the sum of the fees for <br />the work to be done under the permit as set forth in the following schedule. There <br />is no minimum fee for the issuance of a permit for single family residences and <br />duplexes. The minimum total fee for issuance of a permit for all other uses shall be <br />forty dollars ($40.00). <br /> <br />Note: A mechanical Code permit fee is separate from and additional to the fee for <br />any other permit which may be required by Code provisions other than the <br />Mechanical Code.) <br /> <br />FEE SCItEDUI E <br /> <br />1) <br /> <br />For the installation or relocation of each forced-air <br />or gravity-type furnace or burner, including ducts and <br />vents attached to such appliance, up to and including 100,000 BTU/h .... $18.00 <br /> <br />2) <br /> <br />For the installation or relocation of each forced-air <br />or gravity-type furnace or burner, including ducts <br />and vents attached to such appliance over 100,000 BTU/h ............ $25.00 <br /> <br />3) <br /> <br />For the installation or relocation of each boiler, <br />compressor, condensing unit or heat pump up to and <br />including five horsepower, or each absorption system <br />to and including 100,000 BTU/h ............................... $30.00 <br /> <br />4) <br /> <br />For the installation or relocation of each boiler, <br />compressor, condensing unit or heat pump over five <br />horsepower up to and including 30 horsepower or for <br />each absorption system over 100,000 BTU/h up to and <br />including 1,000,000BTU/h ................................... $30.00 <br /> <br />5) <br /> <br />For the installation, relocation of each boiler, <br />compressor, condensing unit or heat pump over 30 <br />horsepower up to and including 50 horsepower or <br />for each absorption system over 1,000,000BTU/h <br />up to and including 1,750,000BTU/h ............................ $37.00 <br /> <br />6) <br /> <br />For the installation or relocation of each boiler, <br />compressor, condensing unit or heat pump over 50 <br />horsepower, or each absorption system over 1,750,000BTU/h ......... $51.00 <br /> <br />7) <br /> <br />For each VAV control box or other air handling unit <br />to and including 10,000 cubic feet per minute, including <br />ducts attached thereto ....................................... $12.00 <br /> <br />Page 57 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.