My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
96-042
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1996
>
96-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:31 PM
Creation date
6/26/2003 10:47:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
96-42
Date
4/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
031 <br /> <br />3.0 GENERAL PROCEDURES <br /> <br />The Environmental Coordinator will verify and supervise the incorporation of all mitigation <br />measures listed in this reporting and monitoring program. The Environmental Coordinator will <br />also be responsible for the overall management of the MMRP. <br /> <br />Verification forms shall be completed and submitted to the Environmental Coordinator in those <br />situations where City staff, other than the Environmental Coordinator, has the appropriate <br />expertise to verify and acknowledge that a specific mitigation measure has been implemented. <br />The completed verification toms shall be kept with this Mitigation Monitoring and Reporting <br />Program throughout the twelve year life of the use of eminent domain for each respective <br />Redevelopment Plan. A sample copy of the Verification Form is included as Appendix A. <br /> <br />If the Environmental Coordinator determines that a mitigation measure has not been properly <br />implemented, the Environmental Coordinator shall assure the mitigation measure shall be <br />implemented before additional project approvals or permits can be issued. <br /> <br />3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.