My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
96-042
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1996
>
96-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:31 PM
Creation date
6/26/2003 10:47:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
96-42
Date
4/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
033 <br /> <br />prior to project approval. Should the <br />potential for subsidence and/or liquefaction <br />potential be identified, measures acceptable <br />to the City Engineer shall be incorporated <br />into the project to reduce or eliminate the <br />potential project impact. <br /> <br />Hydrolog3¥Drainage <br /> <br />During the review offiaure projects <br />within this location, if it is determined by <br />City staffthat runofffrom a project could <br />impact storm drain facilities, appropriate <br />measures such as improvements and/or <br />upsizing will be required to reduce or <br />eliminate the potential impacts on storm <br />drain facilities. <br /> <br />All future projects will be reviewed by <br />Public Works for compliance with NPDES <br />requirements and require all applicable <br />pollution control measures be incorporated <br />into a project to reduce or eliminate urban <br />pollutants from entering local surface waters. <br /> <br />Cultural Resources <br /> <br />If City staff determines during their review <br />of'the project that an existing building is <br />historically important, further study and <br />review will be required to determine whether <br />or not the building will be impacted by the <br />project. The further study will, in all like- <br />lihood, consist of a preliminary historical <br />survey conducted by a recognized person <br />with historical building experience with <br />accompanying conclusions and recommendations. <br /> <br />Air Quality <br /> <br />If it is determined that a future project may <br />create significant construction emissions, <br />short-term air emission calculations will be <br />required as part of the CEQA review of the <br />project. <br /> <br />Prior to the <br />issuance of grading <br />permit or building permit, <br />whichever occurs first. <br /> <br />Prior to the issuance <br />of grading permit or <br />building permit, which <br />ever occurs first. <br /> <br />Prior to project <br />approval. <br /> <br />Prior to project <br />approval. <br /> <br />PWA <br /> <br />PWA <br /> <br />EC <br /> <br />EC <br />PD <br /> <br />5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.