Laserfiche WebLink
458 <br /> <br />avoid the above significant effect. <br /> <br />Facts <br /> <br />Throughout implementation of the Specific Plan, the Public Works Agency shall <br />continue to provide those City-wide traffic and pedestrian circulation <br />improvements that are proposed in the Specific Plan, General Plan, and other City <br />circulation improvement plans. <br /> <br />The City shall review all future proposals within the Specific Plan area on a <br />project-by-project basis and shah impose appropriate conditions and mitigation to <br />ensure that any cimulation impact would be alleviated to the greatest extent <br />feasible. <br /> <br />Throughout implementation of the Specific Plan, the Public Works Agency shall <br />continue to review and implement those neighborhood traffic control measures <br />recommended in this EIR. <br /> <br />No vehicle loading/unloading or vehicle access to parking on Bush Street shall be <br />permitted. Access for vehicle loading/unloading shall be limited to east/west <br />streets, except Washington. <br /> <br />Egress from parking facilities shall be limited to right-turn exits only onto Main <br />Street or onto the westbound direction of a side street. Exits shall be at least 120 <br />feet from Main Street and opposite other driveways where possible. <br /> <br />No onstreet parking (except for metered parking) on Bush Street and other <br />surrounding streets shall be allowed. Limited time metered parking shall be <br />available along Bush Street in addition to residential permit parking where <br />allowed. <br /> <br />ENVIRONMENTAL EFFECT <br /> <br />Impacts to transit services are not expected with mitigation. <br /> <br />Finding <br /> <br />Changes or alterations have been required in and incorporated into the project which <br />avoid the above significant effect. <br /> <br />Facts <br /> <br />Throughout implementation of the Specific Plan, the Public Works Agency shall <br />continue to monitor OCTA improvements associated with its Major Investment <br />Study and notify OCTA of future Midtown development and comply with OCTA <br />requirements, as appropriate and feasible. <br /> <br />FINDINGS OF FACT/MIDTOWN DISTRICT SPECIFIC PLAN/EIR NO. 94-1 7 <br /> <br /> <br />