My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
96-100
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1996
>
96-100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:41 PM
Creation date
6/26/2003 10:47:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
96-100
Date
11/18/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
45U <br /> <br />Throughout implementation of the Specific Plan, the Public Works Agency shall <br />continue to implement City TClVl/TDM measures, as appropriate and feasible. <br /> <br />ENVIRONMENTAL EFFECT <br /> <br />With cumulative projects, one intersection, Seventeenth at Main Streets would operate at <br />LOS F, during AM peak hours. During PM peak hours, seven intersections, Santa Clam <br />Avenue at Broadway, Seventeenth Street at Broadway, Seventeenth at Main Streets, <br />Washington Avenue at Broadway, Washington Avenue at Main Street, Ftrst Street at <br />Broadway, and First at Main Streets would operate at LOS E or worse. <br /> <br />Finding <br /> <br />Changes or alterations have been required in and incorporated into the project which <br />substantially lessen the above significant effect. Enforcement of mitigation measures <br />would partially reduce impact; however, the above effect is considered significantly <br />unavoidable and adverse. <br /> <br />F~.cts <br /> <br />Throughout implementation of the Specific Plan, the Public Works Agency shall <br />continue to provide those City-wide traffic and pedestrian cimulation <br />improvements that are proposed in the Specific Plan, General Plan, and other City <br />circulation improvement plans. <br /> <br />The City shall review all future proposals within the Specific Plan area on a <br />project-by-project basis and shall impose appropriate conditions and mitigation to <br />ensure that any circulation impact would be alleviated to the greatest extent <br />feasible. <br /> <br />Throughout implementation of the Specific Plan, the Public Works Agency shall <br />continue to implement City TCM/TDM measures, as appropriate and feasible. <br /> <br />ENVIRONMENTAL EFFECT <br /> <br />Impacts to parking facilities are not expected with mitigation. <br /> <br />Finding <br /> <br />Changes or alterations have been required in and incorporated into the project which <br />avoid the above significant effect. <br /> <br />Facts <br /> <br />In order to reduce parking impacts, throughout implementation of the Specific <br />Plan, the City shall continue to achieve the following by district: <br /> <br />FINDINGS OF FACT/MIDTOWN DISTRICT SPECIFIC PLAN/EIR NO. 94-1 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.