Laserfiche WebLink
RESOLUTION 97-030 <br /> <br />REVENUE <br />~ DEPARTMENT]MISCELLANEOUS FEE OR SERVICE <br /> <br />SECTION VI PUBLIC WORKS AGENCY - CONTINUED <br /> <br />86-01-5921 Storm Drains/Culverts, Sewer, Water Mains/Line Channels <br /> In Dirt-S82.82 minimum <br /> <br />In Paving-S82.82 minimum <br /> <br />86-01-5920 <br />86-01-5921 <br /> <br />86-01-5921 <br /> <br />86-01-5921 <br /> <br />Sewer Laterals/Water Services <br /> <br />Traffic Occupancy or Lane Closure Requiring Signage <br /> All Streets <br /> Minor Streets <br /> Major Streets <br /> <br />Manhole, Vaults, Camh Basins and required signage, <br /> striping or barricades <br /> Plus Earthwork <br /> <br />Curb, Gutter or Combination including Earthwork <br /> $82.82 minimum <br /> <br />86-01-5921 <br /> <br />Curb Return, including Earthwork <br /> $82.82 minimum <br /> <br />86-01-5921 <br /> <br />Sidewalk including Earthwork <br /> $82.82 minimum <br /> <br />86-01-5921 <br /> <br />Drive Approach including Earthwork <br />$82.82 minimum <br /> <br />86-01-5921 <br /> <br />Paving, including Earthwork <br /> (0 - 2000 sq. ft.)-$82.82 minimum <br /> (Over 2000 sq.ft.)$82.82 minimum <br /> <br />86-01-5921 Fencing <br /> <br />86-01-5621 <br />86-01-5921 <br />86-01-5921 <br />86-01-5621 <br /> <br /> Masonry, Concrete or Block <br /> $82.82 minimum <br /> <br />Street Trees <br /> By Developer, Inspection Only-S58.58 min. <br /> <br />Permanent Street Pa~ch Guarantee <br /> Refundable if done in 30 calendar days <br /> <br />Projects Exceeding $100,000 and/or <br /> Work items not included here <br /> <br />Overtime Rate for Inspectors <br /> <br />UNIT <br /> <br />Linear Foot <br />Minimum <br />Linear Foot <br />Minimum <br /> <br />Each <br /> <br />Per Day <br />Deposit <br />Deposit <br /> <br />Each <br /> <br />Linear Foot <br />Minimum <br /> <br />Each <br />Minimum <br /> <br />Sq. Foot <br />Minimum <br /> <br />Sq. Foot <br />Minimum <br /> <br />Sq. Foot <br />Sq. Foot <br />Minimum <br /> <br />Linear Foot <br />Minimum <br /> <br />Each <br /> <br /> Sq. Foot <br /> <br />Percent of estimated <br />construction costs <br /> <br />Hour <br /> <br />PROPOSED <br />FEES <br />FY97-98 <br /> <br /> 2.65 <br />82.82 <br /> 3.02 <br />82.82 <br /> <br />184.27 <br /> <br />172.89 <br />546.61 <br />727.78 <br /> <br />138.72 <br /> <br /> 1.12 <br />82.82 <br /> <br />44.52 <br />82.82 <br /> <br /> 0.40 <br />82.82 <br /> <br /> 0.52 <br />82.82 <br /> <br /> 0.17 <br /> 0.12 <br />82.82 <br /> <br /> 0.98 <br />82.82 <br /> <br />21.23 <br /> <br /> 20.86 <br /> <br />3.25% <br /> <br />34.16 <br /> <br />page 27 <br /> <br /> <br />