Laserfiche WebLink
RESOLUTION 97-030 <br /> <br /> REVENUE <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />SECTION X PLANNING & BUILDING AGENCY - CONTINUED <br />5915 MECHANICAL CODE <br /> <br />Any person desiring a permit required by the Mechanical <br />Code shall, at the time of filing an application therefor, pay <br />a fee equal to $17.50 plus the sum of the fees for the work <br />to be done under the permit as set forth in the following <br />schedule. There is no miuimum fee for the issuance ora <br />permit lbr single I~amily residences and duplexes. The <br />minimum total fee for issuance ora permit for all other uses <br />shall be $41.00. <br /> <br />Note: A mechanical Code permit fee is separate from and <br />additional to the fee for any other permit which may be <br />required by Code provisions other than the Mechanical Code. <br /> <br />FEE SCHEDULE <br /> <br />5915 <br /> <br />1) <br /> <br />For the installation or relocation of each forced-air <br />or gravity-type furnace or burner, including ducts <br />and vents attached to such appliance, up to aod <br />including 100,000 BTU/h <br /> <br />5915 <br /> <br />2) <br /> <br />For the installation or relocation of each forced-air <br />or gravity-type fumace or burner, including ducts <br />and vents attached to such appliance over 100,000 BTU/h <br /> <br />5915 <br /> <br />3) <br /> <br />For the installation or relocation of each boiler, <br />compressor, condensing unit or heat pump up to and <br />including five horsepower, or each absorption system <br />to and including lO0,000 BTtJ/h <br /> <br />5915 <br /> <br />4) <br /> <br />For the installation or relocation of each boiler, <br />compressor, condensing unit or heat pump over five <br />horsepower up to and including 30 horsepower or <br />for each absorption system over 100,000 BTU/h up <br />to and including 1,000,000 BTU/h <br /> <br />5915 <br /> <br />5) <br /> <br />For the installation, relocation of each boiler, <br />compressor, condeosing unit or heat pump over 30 <br />horsepower up to and including 50 borsepower or <br />for each absorption system over 1,000,000 BTU/h <br />up to and including 1,750,000 BTU/h <br /> <br />5915 <br /> <br />6) <br /> <br />For the installation or relocation of each boiler, <br />compressor, condensing unit or heat pump over 50 <br />horsepower, or each absorption system over <br />1,750,000 BTU/h <br /> <br />5915 <br /> <br />7) <br /> <br />For each VAV control box or air handling <br />unit to and including 2,000 cubic feet per minute, <br />including ducts attached thereto <br /> <br />page 55 <br /> <br />UNIT <br /> <br />Each <br />Permit <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />PROPOSED <br />FEES <br />FY97-98 <br /> <br />17.50 <br /> <br />41.00 <br /> <br />18.50 <br /> <br />25.70 <br /> <br />30.75 <br /> <br />30.75 <br /> <br />37.95 <br /> <br />52.30 <br /> <br />12.30 <br /> <br /> <br />