My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
97-030
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1997
>
97-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2014 1:54:52 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
97-30
Date
6/2/1997
Document Relationships
96-035
(Repeals)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1996
98-017
(Repealed By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 97-030 REVENUE <br /> ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br /> SECTION X PLANNING & BUILDING AGENCY - CONTINUED <br /> 5914 4) Self-contained water heater (residential type) <br /> <br />5914 5) Water heater (commercial type) <br />5914 6) Heat exchanger <br />5914 7) Water piping replacement, each 100 feet <br />5914 8) Gas piping service, 1-5 outlets <br />5914 9) Backflow prevention device <br /> <br />5914 10) For each appliance or piece of equipment regulated <br /> by this code for which no fee is listed <br /> <br />5914 1 l) Inspections outside of normal business hours <br /> (4 hour minimum charge for Itolidays, Saturday <br /> and Sunday inspectious) <br /> <br />5914 12) Re-inspection fee assessed uuder provisions of the <br /> Building Code <br /> <br />5914 13) Inspections for which no fee is specifically indicated <br /> (minimum charge - one (l) hour) <br /> <br />5914 14) Additional plan review required by changes, <br /> additions, or revisions to approved plans (minimum <br /> charge - one ( I ) hour) <br /> <br />SOLAR PLAN CHECK FEES <br /> <br />Whenever solar plans are required by the Building Official, <br />plan check fees shall be 65% of the solar permit fee and <br />shall be paid at the time of submitting plans. <br /> <br />UNIT <br />Each <br />Each <br />Each <br />Each 100' <br />Each <br />Each <br /> <br />Each <br /> <br />Per ttour <br />Per Hour <br />Per Hour <br /> <br />Per Hour <br /> <br />PROPOSED <br />FEES <br /> FY 97-98 <br /> <br /> 6.15 <br /> 30.75 <br /> 6.15 <br /> 12.30 <br /> 12.30 <br /> 6.15 <br /> <br />6.15 <br /> <br />52.30 <br /> <br />52.30 <br /> <br />52.30 <br /> <br />52.30 <br /> <br />page 65 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.