Laserfiche WebLink
RESOLUTION 98-017 <br />74 <br /> <br />ACCOUNT <br /> <br />DEPARTMENTfMISCELLANEOUS FEE OR SERVICE <br /> <br />SECTION VI PUBLIC WORKS AGENCY - CONTINUED <br /> <br />86-01-5921 Storm Drains/Culverts, Sewer, Water Mains/Line Channels <br /> In Dirt-S84.31 minimum <br /> <br />In Paving-S84.31 minimum <br /> <br />86-01-5920 <br />86-01-5921 <br /> <br />86-01-5921 <br /> <br />86-01-5921 <br /> <br />Sewer Laterals/Water Services <br /> <br />Traffic Occupancy or Lane Closure Requiring Signage <br /> All Streets <br /> Minor Streets <br /> Major Streets <br /> <br />Manhole, Vaults, Catch Basins and required signage, <br /> striping or barricades <br /> Plus Earthwork <br /> <br />Curb, Gutter or Combination including Earthwork <br /> $84.31 minimum <br /> <br />86-01-5921 <br /> <br />Curb Return, including Earthwork <br /> $84.31 minimum <br /> <br />86-01-5921 <br /> <br />Sidewalk including Earthwork <br /> $84.31 minimum <br /> <br />86-01-5921 <br /> <br />Drive Approach including Earthwork <br /> $84.31 minimum <br /> <br />86-01-5921 <br /> <br />Paving, including Earthwork <br /> (0 - 2000 sq. ft.)-$84.31 minimum <br /> (Over 2000 sq. fx.)$84.31 minimum <br /> <br />86-01-5921 Fencing <br /> <br />86-01-5621 <br />86-01-5921 <br />86-01-5921 <br />86-01-5621 <br /> <br />Masonry, Concrete or Block <br />$84.31 minimum <br /> <br />Street Trees <br /> By Developer, Inspection Only-S59.63 min. <br /> <br />Permanent Street Patch Gnamntee <br /> Refundable if done in 30 calendar days <br /> <br />Projects Exceeding $100,000 aud/or <br /> Work items not included here <br /> <br />Overtime Rate for Inspectors <br /> <br />Linear Foot <br />Minimum <br />Linear Foot <br />Minimum <br /> <br />Each <br /> <br />Per Day <br />Deposit <br />Deposit <br /> <br />Each <br /> <br />Linear Foot <br />Minimum <br /> <br /> Each <br />Minimum <br /> <br />Sq. Foot <br />Minimum <br /> <br />Sq. Foot <br />Minimum <br /> <br />Sq. Foot <br />Sq. Foot <br />Minimum <br /> <br />Linear Foot <br />Minimum <br /> <br />Each <br /> <br /> Sq. Foot <br /> <br />Percent of estimated <br />construction costs <br /> <br />Hour <br /> <br />PROPOSED <br />FEES <br /> FY 98-99 <br /> <br /> 2.70 <br />84.31 <br /> 3.07 <br />84.31 <br /> <br />187.59 <br /> <br />176.00 <br />556.45 <br />740.88 <br /> <br />141.22 <br /> <br /> 1.14 <br />84.31 <br /> <br />45.32 <br />84.31 <br /> <br /> 0.41 <br />84.31 <br /> <br /> 0.53 <br />84.31 <br /> <br /> 0.17 <br /> 0.12 <br />84.31 <br /> <br /> 1.00 <br />84.31 <br /> <br />21.61 <br /> <br />21.24 <br /> <br />3.25% <br /> <br /> 34.77 <br /> <br />P~e27 <br /> <br /> <br />