Laserfiche WebLink
:LO2 <br /> <br /> REVENUE <br /> ACCOUNT <br /> <br /> 5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br /> <br />MECHANICAL CODE <br /> <br />Any person desiring a permit required by the Mechanical <br />Code shall, at the time of filing an application therefor, pay <br />a fee equal to $18.00 plus the sum of the fees for the work <br />to be done under the permit as set forth in the following <br />schedule. There is no minimum fee for the issuance of a <br />permit for single family residences and duplexes. The <br />minimum total fee for issuance of a permit for all other uses <br />shall be $42.00. <br /> <br />Note: A mechanical Code permit fee is separate from and <br />additional to the fee for any other permit which may be <br />required by Code provisions other than the Mechanical Code. <br /> <br />FEE SCHEDULE <br /> <br />1) <br /> <br />For the installation or relocation of each forced-air <br />or gravity-type furnace or burner, including ducts <br />and vents attached to such appliance, up to and <br />including 100,000 BTU/h <br /> <br />2) <br /> <br />For the installation or relocation of each forced-air <br />or gravity-type furnace or burner, including ducts <br />and vents attached to such appliance over 100,000 BTU/h <br /> <br />3) <br /> <br />For the installation or relocation of each boiler, <br />compressor, condensing unit or heat pump up to and <br />including five horsepower, or each absorption system <br />to and including 100,000 BTU/h <br /> <br />4) <br /> <br />For the installation or relocation of each boiler, <br />compressor, condensing unit or heat pump over five <br />horsepower up to and including 30 horsepower or <br />for each absorption system over 100,000 BTU/h up <br />to and including 1,000,000 BTU/Ia <br /> <br />5) <br /> <br />For the installation, relocation of each boiler, <br />compressor, condensing unit or heat pump over 30 <br />horsepower up to and including 50 horsepower or <br />for each absorption system over 1,000,000 BTU/h <br />up to and including 1,750,000 BTU/h <br /> <br />6) <br /> <br />For the installation or relocation of each boiler, <br />compressor, condensing unit or heat pump over 50 <br />horsepower, or each absorption system over <br />1,750,000 BTU/h <br /> <br />7) <br /> <br />For each VAV control box or air handling <br />unit to and including 2,000 cubic feet per minute, <br />including duets attached thereto <br /> <br />UNIT <br /> <br />Each <br />Permit <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />PROPOSED <br />FEES <br />FY 98-99 <br /> <br />18.00 <br /> <br />42.00 <br /> <br />18.75 <br /> <br />26.25 <br /> <br />31.50 <br /> <br />31.50 <br /> <br />38.75 <br /> <br />53.25 <br /> <br />12.50 <br /> <br />Page 55 <br /> <br /> <br />