Laserfiche WebLink
108 <br /> <br /> REVENUE <br /> ACCOUNT <br /> <br /> 5912 <br /> <br />5912 <br /> <br />5912 <br /> <br />5912 <br /> <br />5912 <br /> <br />5912 <br /> <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br /> <br />29) <br /> <br />For each appliance, fixture or piece of equipment <br />regulated by this code but not classed in other <br />categories, for which no other fee is listed in this <br />code <br /> <br />(a) Sewage Ejector <br />(b) Sump Pump <br />(c) Hot Water Storage Tank <br />(d) Heat Exchangers <br />(e) Cooling Tower <br />(f) House Booster Pumps <br /> <br />30) Temporary gas service <br /> <br />31) <br /> <br />Inspections outside of normal business hours <br />(4 hour minimum charge for Holidays, Saturday <br />or Sunday inspections) <br /> <br />32) <br /> <br />Re-inspection fee assessed under applicable <br />provisions of the Building Code <br /> <br />33) <br /> <br />Inspections for which no fee is specifically <br />indicated (minimum charge - one (1) hour) <br /> <br />34) <br /> <br />Additional plan review required by changes, <br />additions or revisions to approved plans <br />(minimum charge - one (1) hour) <br /> <br />UNIT <br /> <br />Each <br /> <br />Each <br /> <br />Per Hour <br />Per Hour <br />Per Hour <br /> <br />Per Hour <br /> <br />PROPOSED <br />FEES <br />FY 98-99 <br /> <br />18.75 <br /> <br />132.50 <br /> <br />53.25 <br /> <br />53.25 <br /> <br />53.25 <br /> <br />53.25 <br /> <br />PLUMBING PLAN CHECK FEES <br /> <br />Whenever plumbing plans are required by the Building <br />Official, plan check fees shall be 65 95 of the plumbing <br />permit fee and shall be paid at the time of submitting plans. <br /> <br />Page 61 <br /> <br /> <br />