My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
98-043
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1998
>
98-043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:09 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
98-43
Date
8/3/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
295 <br /> <br />Variance No. 98-06 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with applicable sections of the Santa <br />Ana Municipal Code, the California Administrative Code, the Uniform Fire <br />Code, the Uniform Building Code, and all other applicable regulations. In <br />addition, it shall meet the following conditions of approval: <br /> <br />The applicant must comply with each and every condition listed below prior <br />to exercising the rights conferred by this variance. <br /> <br />The applicant must remDin in compliance with all conditions listed b~low <br />throughout the life of the variance. Failure to comply with each and ~%ery <br />conditions may result in the revocation of the' variance~ .. <br /> <br />Plannlnq Division <br /> <br />Compliance with the DP No. 97-61 Site Plan Review comments with <br />the exception of the items covered by the variance. <br /> <br />A parking plan needs to be submitted that identifies additional <br />parking facilities that will be used during those days that <br />events between the ballet studio, Bower's Museum and the Kidseum <br />are held simultaneously. <br /> <br />In the event the Kidseum or Bower's Museum South Lot parking <br />facilities are removed, replacement parking facilities must be <br />located on a site within 300 feet of the St. Joseph Ballet <br />parcel. <br /> <br />e <br /> <br />Any changes to the building elevations, including materials and <br />colors, must be submitted to staff for review. <br /> <br />The crushing of any demolition materials will not be permitted <br />on the site. All construction debris must be removed from the <br />premises within five working days. <br /> <br />Police Department <br /> <br />The alcove created by the patio on the north perimeter of the <br />project needs to be fenced off with materials acceptable to the <br />Planning Division and Police Department. <br /> <br />The existing parking lot immediately west of the studio, the <br />student drop-of area, and the entrances to the facility located <br />at each gate and on the north perimeter must be illuminated to <br />a minimum maintained one footcandle of light. <br /> <br />ATTACHMENT A <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.