Laserfiche WebLink
598 <br /> <br />RESOLUTION NO. 95-89 <br />PAGE 10 OF14 <br /> signage and construction <br /> and sidewalk, etc. <br /> <br />of curbs, gutters, <br /> <br />i) <br /> <br />Submit street improvement plans for Main, <br />Bush, Spurgeon, and Third Streets. <br />Improvements must be completed or bond posted <br />prior to issuance of a building permit. <br />Street improvement plans must include the <br />following: <br /> <br />Remove and replace all damaged <br />asphalt street paving from curb <br />lane on Third Street as required by <br />approved improvement plan. <br /> <br />(2) <br /> <br />Remove and replace all damaged curb <br />and gutter on Main, Bush, Spurgeon, <br />and Third Streets and construct new <br />curb and gutter as required by <br />approved improvement plan. <br /> <br />(3) <br /> <br />Remove and replace all damaged <br />sidewalks on Main, Bush, Spurgeon, <br />and Third Streets and construct a <br />new curb and gutter as required by <br />approved improvement plan. <br /> <br />(4) <br /> <br />Relocate or adjust utility vaults <br />in sidewalk on all streets <br />bordering the site according to <br />direction given by appropriate <br />utility company and per approved <br />improvement plan. <br /> <br />(5) <br /> <br />Close all existing driveway <br />approaches on Bush, Spurgeon, and <br />Third Streets per approved <br />improvement plan. <br /> <br />(6) <br /> <br />Construct new driveway approaches <br />on Bush, Spurgeon, and Third <br />Streets per approved improvement <br />plan. <br /> <br />(7) <br /> <br />Construct curb return radius with <br />wheelchair ramp per City Standard <br />No. 1122A and a minimum 6.5 foot by <br />6.5 foot concrete corner cut-off at <br />the Bush Street and Third Street <br />intersection per approved <br />improvement plan. <br /> <br />Construct all necessary paving <br />on/off site per approved plans and <br />to the satisfaction of city staff. <br /> <br /> <br />