Laserfiche WebLink
602 <br /> <br />RESOLUTION NO. 95-89 <br />PAGE 14 OF 14 <br /> <br />e) <br /> <br />Prior to issuance of applications for water <br />services for Phase's I, II, and III, complete <br />the following: <br /> <br />(1) <br /> <br />Arrange for installation of any needed <br />new or relocation or upgrading of any <br />existing domestic or irrigation WATER <br />SERVICES, as required by the Public <br />Works Agency. These facilities will be <br />installed in conformance with City <br />Standards and approved plans. <br />Installation will be done by City forces <br />at the developer's expense and can take <br />up to six weeks from the time of <br />application and payment of charges. <br />Demand calculations per gallon per <br />minute for size determination are <br />required for both domestic and <br />irrigation water meters. <br /> <br />NOTE: <br /> <br />All projects with more than 2,500 <br />square feet of landscaping and a <br />lot size greater than 15,000 square <br />feet will require separate <br />landscape irrigation water meter of <br />proper size to supply the project's <br />landscape irrigation system. <br /> <br /> <br />