My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
98-090
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1998
>
98-090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:30:16 PM
Creation date
6/26/2003 10:47:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
98-90
Date
12/14/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
616 <br /> <br />ENVIRONMENTAL EVALUATION <br />ER $98-060 <br />EAST SECOND STREE~ LIVE/WORK ARTIST <br />201 N. MAIN STREET <br />Revised December 14, 1998 <br />PAGE 4 <br /> <br />The proposed project would not produce any significant <br />alterations to the course or flow of ground waters. No <br />impacts are anticipated. <br /> <br />Mitigation Measures/Monitoring Re~uire~: None Required <br /> <br />Activities related to the construction or use of the <br />proposed project are not anticipated to impact <br />groundwater quality. As the project is proposed, no <br />impacts are anticipated. <br /> <br />Mitigation Measures/Monitoring Require4: None Required <br /> <br />The proposed project, in conjunction with other past, <br />present, and reasonable foreseeable future projects, will <br />contribute to the utilization of public water. However, <br />no significant impacts are anticipated due to the limited <br />scale of the project. <br /> <br />Mitigation Measures/Monitoring Require4: None Required <br /> <br />AIR RESOURCES <br /> <br />During demolition of the two existing buildings and <br />construction of the proposed development, air quality in <br />the local area will be impacted. Short-term <br />construction-related activities will cause combustion <br />emissions and fugitive dust to be released from on-site <br />demolition activities and construction equipment. Short <br />term impacts will be mitigated to a level of <br />insignificance. Long term impacts to air quality may <br />occur but are considered to be cumulatively <br />insignificant. <br /> <br />Mitigation Measures/Monitoring Required: <br /> <br />In order to prevent dust impacts to the adjacent <br />areas, following the demolition of the two <br />buildings, the applicant shall remove the building <br />debris material from the site within 48 hours. <br /> <br />4. The applicant shall ensure that all unpaved <br /> construction areas shall be watered at least twice <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.