My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-061 - Urban Design Element of the General Plan of the City of Santa Ana
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2001
>
2001-061 - Urban Design Element of the General Plan of the City of Santa Ana
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:29:39 PM
Creation date
6/26/2003 10:47:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2001-061
Date
9/17/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On-site Improvements: The are~ileading up to the intersections <br />are fairly well landscaped on the private properties surrounding <br />this gateway. A palm and dry landscape theme that matches the <br />Embassy Suites property could be continued onto the two <br /> <br />cloverleaf areas on the south side of Dyer Road that is under <br />the jurisdiction of CALTRANS. The site is currently devoid of <br />trees, shrubs and ground cover. Funding for the landscaping <br />would be a joint effort between the City of Santa Aha and <br />CALTR3%NS. <br /> <br />Refer to Exhibits 6 and 7. <br /> <br />Gateway 8 <br /> <br />Bristol Street at Sunflower Avenue <br /> <br />Off-site Improvements: Re-design the existing city en~yway <br />monument on the Bristol Street median just north of the <br />intersection .to the approved standard. Continue the <br />construction of medians along Bristol Street from Sunflower <br />Avenue to Warner Avenue using Date Palms as the spine in the <br />middle of Bristol Street; the funding of these improvements <br />would come from the Public Works Agency through Capital <br />Improvement Projects money. <br /> <br />On-site Improvements: Continue with the established plant <br />palette for the Bristol Street Corridor Streetscape. Develop a <br />vertical tree theme for interior parking lots, particularly in <br />the South Coast Metro retail areas. A semi-circle of Canary <br />Island Palms emphasizes the enhanced intersection of Bristol and <br />Sunflower per the Bristol Street Corridor theme. Funding would <br />occur under private development as each site redevelops or goes <br />through the site plan development process for a discretionary <br />action. Funding for the parkway streetscape could be generated <br />from Public Works Capital Improvement Projects money. <br /> <br />Refer to Exhibits 8 and 9. <br /> <br />Me\Po1 icies&Procedures\Gat eways Revised <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.