Laserfiche WebLink
Conditions for Ao=roval for Conditional Use Penmit No. 2002-01 <br /> <br />Conditional Use Permit No. 2002-01 is approved subject to compliance, to the reasonable <br />satisfaction of the City Council, with all applicable sections of the Santa Ana Municipal <br />Code, the California Administrative Code, the Uniform Fire Code, the Uniform Building <br />Code and all other applicable regulations. <br /> <br />The applicant must comply in full with each and every condition listed below prior to <br />exemising the rights conferred by this conditional use permit. <br /> <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br /> <br />A. Plannina Division <br /> <br />The project shall remain in compliance with Site Plan Review DP No. 01- <br />14. <br /> <br />Any amendment to this conditional use permit must be submitted to the <br />Planning Division for review. At this time, staff will determine if <br />administrative relief is available or the conditional use permit must be <br />amended. <br /> <br />Mitiqation Measures <br /> <br />Prior to issuance of a building permit, the applicant shall submit for review <br />and approval a surface drainage/grading/erosion control plan prepared by <br />a registered Civil Engineer, showing the direction and means of flow to the <br />adjacent street. The plan is to include existing and proposed elevations at <br />and adjacent to all property lines. Drainage routed to the street must be <br />directed beneath the sidewalk and through the curb. <br /> <br />Prior to the issuance of any construction permits, the applicant shall be <br />issued a closure letter from the Santa Ana Fire Department and/or the <br />State Regional Water Quality Control Board. <br /> <br />Prior to issuance of a grading permit, the applicant shall prepare an <br />NPDES post-construction storm water management plan per Orange <br />County Drainage. Area Management Plan (DAMP) that includes all <br />structural and non-structural Best Management Practices. <br /> <br />ao <br /> <br />Submit and have approved a surface drainage/utility plan that <br />includes all Structural Best Management Practices. <br /> <br />Resolution No. 2002-026 <br />Page 4 of 5 <br /> <br /> <br />