Laserfiche WebLink
SEC'rION X <br /> <br />PLANNING & BUILDING AGENCY <br />APPEALS <br /> <br />The fee for an appeal of a ruling of the Building Official to <br />the Planning Commission (SAMC Section 806.254) shall be <br />payable at the time of filthg of the appeal. <br /> <br />Each <br /> <br />PROPOSED <br /> <br /> FY 02-03 <br /> FEES <br /> <br />835.00 <br /> <br />5911 <br /> <br />RELOCATION INSPECTIONS <br /> <br />The fee for an inspection on a building or structure, as <br />required for its proposed relocation. <br /> <br />Main building or structure <br />Accessory structure <br />Inspection for structures located outside of the City <br />Travel time <br /> <br />5401 <br /> <br />APPLICATION PROCESSING AND <br />PLAN CHECKING FEES <br /> <br />An application processing fee and plan checking fee shall be <br />paid to the Building Official at the time of submi~ing plans <br />for checking. Such fee shall be equal to 65% of the building <br />permit fee as set forth in this resolution. For all buildings, <br />such fee shall also include a surcharge for state mandated <br />energy conscrvarion enforcement equal to $22.00 for each <br />1,000 square fee~ of building area, or fraction thereof, up to <br />4,000 square feet, and $11.00 for each additional 1,000 <br />square feet or fraction thereof. For any plan submi~ed which <br />is subject to the disabled accessibility ~qdirements of Title 24, <br />California Code of Rngalations, a surcharge of 10% of the <br />basic plancbeck fee shall be required. <br /> <br />5911 <br />5401 <br /> <br />O~HPD CERTIFICATION FEE <br /> <br />Whenever plans are submitted for the construction of spaeialized <br />medical clinics which require by law certification of compliance with <br />requirements set forth by the Office of Statewide Health Planning <br />and Development (OSHPD-3 certification), a building permit fee will <br />be paid to the Building Official equivalent to 1% of the construction <br />valuation. An additional plan check fee equivalent to .65% of the <br />construction valuation will be paid to the Building Official at the time <br />plans are submii~ed for plan check. T~is fee de~s not preclude other <br />applicable fees which are normally assessed by the City. <br /> <br />5911 <br /> <br />MICROFILM RECORDS <br /> <br />Whenever plans are submi'aed which are required by any law <br />or City procedure to be maintained as a permanent record, <br />the following fees are to be charged for the purpose of <br />creating and maintaining permanent files. <br /> <br />Each Sheet <br /> <br />2.45 <br /> <br />5401 <br />54O2 <br />5403 <br />5405 <br /> <br />RESEARCH AND PROCESSING FEES <br /> <br />Whenever die Building Official is requested to approve <br />alternate materials or methods of construction in accordance <br />with tlm Building Code, Plumbing Code, Mechanical Code or <br />the Administrative Code provisions for the Electrical Code. <br /> <br /> Whenever the Building Official is requested to approve a <br /> modification of code in accordance with the Building Cede, <br /> Plumbing Code, Mechanical Code or the Administrative Code <br />Resolution Nc~'c~i~H~d~e Electrical Code. <br />Page 46 of 60 <br /> <br />Each <br /> <br />180.00 <br /> <br />180.00 <br /> <br /> <br />