Laserfiche WebLink
REVENUE <br />ACCOUNT <br /> <br />SECTION X <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />5915 <br /> <br />PLANNING & BUILDING AGENCY <br /> <br />FEE SCHEDULE <br /> <br />1) <br /> <br />For the installation or relocation of each forced-air or <br />gravity-typo furnace or burner, including duets and <br />vents attachad to such appliance, up to and including <br />100,000 BTU/h <br /> <br />2) <br /> <br />For the installation or relocation of each forced-air <br />or gravity-typo furnace or burner, including ducts <br />and vents attached to such appliance over 100,000 BTU/h <br /> <br />3) <br /> <br />For the installation or relocation of each boiler, compressor, <br />condensing unit or heat pump up to and including five <br />horsepower, or each absorption system to and including <br />100,000 BTUPa <br /> <br />4) <br /> <br />For the installation or relocation of each boiler, <br />compressor, condensing unit or heat pump over five <br />horsepower up to and including 30 horsepower or <br />for each absorption system over 100,000 BTU/h up <br />to and including 1,~00,000 BTU/h <br /> <br />5) For the installation, relocation of each boiler, compressor, <br /> condensing unit or heat pump over 29 borsel~wer up to and <br /> including 50 horsepower or for each absorption system over <br /> 1,000,000 BTU/h up to and including 1,750,0~0 BTU/h <br /> <br />6) For the installation or relocation of each boiler, compressor, <br /> cov~ensing unit or heat pump over 49 horsepower, or each <br /> absorption system over 1,750,00~ BTU/h <br /> <br />For each VAV control box or air handling <br />unit to and including 2,000 cubic feet per minute, <br />including ducts attached thereto <br /> <br />8) For each VAV or air-handling unit over 2,000 cfm <br /> <br />Note: This fee shall not apply to an air-handling <br /> unit which is a portion of a faetow assembled <br /> appliance, cooling unit, evaporative cooler or <br /> absorption unit for which a permit is required else <br /> where in this cede. <br /> <br />9) Outdoor dual packaged heating and cooling <br /> <br />10) For the installation or relocation of each floor <br /> furnace, including vent <br /> <br />11) For the installation or relocation of each suspended <br /> heater, recessed wall heater or floor-mounted unit heater <br /> <br />12) Decorative fireplace <br /> <br />13) <br /> <br />For the repair of, alteration of, or addition to each heating <br />appliance, refrigeration unit, cooling unit, absorption <br />unit, or each heating cooling, absorption, or evaporative <br />cooling system, including installation of controls <br />regulated by this code <br /> <br />Note: Each HVAC system served by a VAV <br /> control box is considered a separate systera. <br /> <br />UNIT <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />Each <br /> <br />PROPOSED <br /> <br /> FY 0~-03 <br /> FEES <br /> <br />21.25 <br /> <br />30.00 <br /> <br />36.00 <br /> <br />36.00 <br /> <br />14.50 <br /> <br />21.25 <br /> <br />36.00 <br /> <br />21.25 <br /> <br />21.25 <br /> <br />14.50 <br /> <br />Resolution No. 2002-041 <br /> Page 53 of 60 <br /> <br /> <br />