Laserfiche WebLink
design standards established by the City with its inclusion of improvements. However, the <br />proposed project would require drainage easements to ensure adequate drainage facilities are <br />maintained. <br /> <br />Mitigation Measures for Impact HYD-2. <br /> <br />HYD-2 <br /> <br />Prior to the issuance of building permits the applicant shall record a drainage <br />easement along the northern Raitt Street driveway, between Alton Avenue and the <br />northern catch basin. <br /> <br />HYD-3 <br /> <br />Prior to issuance of building permits a storm drain easement shall be recorded <br />between the northern catch basin and Macarthur Boulevard. <br /> <br />Findings for Impact HYD-2. The City finds that the above-identified changes or alterations <br />would reduce the impact identified as HYD-2 to less than significant levels and are herby <br />incorporated into the project. No additional mitigation measures are necessary with the <br />implementation of Mitigation Measures HYD-2 and HYD-3. <br /> <br />Land Use <br /> <br />Impact LU-2. The proposed project would contribute traffic to intersections projected to operate <br />at unacceptable levels of service. The proposed project would require regional roadway <br />improvements at the intersections of Fairview Street/Segerstrom Avenue, Bristol <br />Street/Segerstrom Avenue, Fairview Street/MacArthur Boulevard, Bristol Street/Segerstrom <br />Avenue to increase the projected level of service to acceptable levels. Such improvements would <br />require the acquisition of an existing land use and encroachments into existing landscape setbacks <br />and flood control facilities. The proposed project would make a fair share contribution to the <br />future implementation of these improvements, which are identified in the City's Circulation <br />Element. Site-specific evaluation of these impacts would occur when the regional roadway <br />improvements would be implemented. <br /> <br />Mitigation Measure for LU-2. <br /> <br />LU-1 <br /> <br />Prior to implementation of regional roadway improvements at the intersections of <br />Fairview Street/Segerstrom Avenue, Bristol Street/Segerstrom Avenue, Fairview <br />Street/MacArthur Boulevard, Bristol Street/Segerstrom Avenue, site-specific <br /> <br />14 <br /> <br /> <br />