My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-077 - Certifying the Environmental Impact Report for the Armstrong Ranch Development Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2002
>
2002-077 - Certifying the Environmental Impact Report for the Armstrong Ranch Development Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:29:28 PM
Creation date
6/26/2003 10:47:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2002-077
Date
10/7/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR-10 <br /> <br />TR-10a <br /> <br />TR-11 <br /> <br />TR-12 <br /> <br />TR-13 <br /> <br />TR-14 <br /> <br />Fairview Street/Segerstrom Avenue~Add a left-turn lane and a separate right-turn lane <br />on the westbound approach. Add a left-turn lane on the eastbound approach. The <br />westbound and eastbound approaches along Segerstrom Avenue would each have dual <br />left-turn lanes, two through lanes, and a separate right-turn lane. The improvements <br />to the westbound approach can be accomplished by restriping within the existing <br />right-of-way. <br /> <br />To mitigate project impacts in the 2007 and/or 2025 horizon years, the applicant <br />shall make a one-time payment of $100,000 as a fair share contribution for <br />intersection improvements at Fairview Street/Segerstrom Avenue (TR-10 and TR- <br />13), Bristol/Segerstrom Avenue (TR-11 and TR-15) Greenville Street/Alton Avenue <br />(TR-12) and Fairview Street/MacArthur Boulevard (TR-14). Evidence of this <br />payment shall be provided to the Public ~Vorks Agency prior to issuance of the first <br />building permit for the project. <br /> <br />Bristol Street/Segerstrom Avenue--Add a second northbound and southbound left-turn <br />lane along Bristol Street. The northbound and southbound approaches would each <br />have dual left-turn lanes, two through lanes, and a shared through-fight turn lane. <br /> <br />Greenville Street / Alton Avenue--Restripe the eastbound and westbound approaches to <br />provide a left-turn lane, one through lane, and a shared through-right turn lane. This <br />improvement can be incorporated within the roadway widening improvement <br />recommended along Alton Avenue. <br /> <br />Fairview Street/Segerstrom Avenue~Add a second southbound left-turn lane by <br />restriping the southbound approach within the existing right-of-way. The <br />northbound and southbound approaches would each have dual left-turn lanes, two <br />through lanes, and a shared through-right turn lane. Add a left-turn lane and a <br />through lane on the westbound and eastbound approaches of Segerstrom Avenue. <br />The westbound and eastbound approaches would each have dual left-turn lanes, two <br />through lanes, and a shared through-right turn lane. <br /> <br />Fairview Street / MaeArthur Boulevard Add a southbound.right-turn lane. Also, add <br />separate right-turn lanes along the northbound and eastbound approaches. The lane <br />configurations at all the approaches including the proposed improvement at this <br /> <br />21 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.