My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-077 - Certifying the Environmental Impact Report for the Armstrong Ranch Development Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2002
>
2002-077 - Certifying the Environmental Impact Report for the Armstrong Ranch Development Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:29:28 PM
Creation date
6/26/2003 10:47:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2002-077
Date
10/7/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EIRs, the City hereby finds that there is no new significant information and no need to recirculate the EIR. <br />Therefore, the Final EIR has been prepared and considered by the City. <br /> <br />3.5 Final Environmental Impact Report <br /> <br />The City has prepared a Final Environmental Impact Report (Final EIR), which, in accordance with <br />the requirements of CEQA and the CEQA Guidelines, consists of: <br /> <br />(a) The Draft EIR; <br /> <br />(b) Comments and recommendations received on the Draft EIR; <br /> <br />(c) A list of persons, organizations, and public agencies commenting on the Draft EIR; <br /> <br />(dj The City's responses to comments received on the Draft EIR; and <br /> <br />(e) Other information added by the City, including all documents incorporated by reference. <br /> <br />4.0 PROJECT IMPACTS AND DISPOSITION OF RELATED <br />MITIGATION MEASURES IDENTIFIED IN THE FINAL EIR <br /> <br />The analysis in the Final EIR identifies all of the significant environmental impacts of the proposed project. <br />All of the mitigation measures identified in the Final EIR are included in the Approval and are made <br />conditions of the project. The following Findings are made with respect to each significant environmental <br />impact. In addition, the following provides a more thorough description of the potential/rnpacts of the <br />project and mitigation measures in support of the Findings. <br /> <br />4.1 Effects Determined To Be Mitigated To Less-Than-Significant Levels <br /> <br />The following impacts have been reduced to less than significant levels. <br /> <br />Biological Resources <br /> <br />Impact MOd. project construction would potentially disturb burrowing owl habitat established in the <br />interim of the biological resources survey and commencement of construction activities. The burrowing <br />owl was not observed at the project site during field survey. However, there is the potential for an active <br />burrow to be established on the project site prior to projecf construction, and this species is designated as a <br />federal and State Species of Concern. <br /> <br />Mit~aOonM~sureforlmpact MOd. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.